Skip to content

Laxmi Apartments

by Pareena Infrastructures · Sector 99, Gurugram

Not on our price list yet

Possession 30 Jun 2022 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 99, Gurugram0.5 km from Dwarka Expressway, in a straight linePrices and what changed
Carpet area
425–639 sq ft
In m²about 39–59 m², as declared
Registered
27 Jul 2017
Registered by
PAREENA INFRASTRUCTURE PVT. LTD.the company that filed it, for Pareena Infrastructures
Timeline
  1. 27 Jul 2017Registered with HARERAHARERA, read 4 Nov 2026
  2. 14 Sep 2020Registration valid toHARERA, read 4 Nov 2026
  3. 30 Jun 2022Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

837homes, 425 to 639 sq ft of carpet area
  • Under 1,000 sq ft425–639 sq ft837

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • KitchenTiles
  • Kitchen appliancesSingle bowl stainless sink
  • Lifts10 person and 13 persons lift in each tower
  • FloorsTiles
  • WallsOil bound distemper
  • BathroomsUp to 5 FEET tiles and oil bound distemper in other areas
  • WindowsM.S. chokkat, M.S. Z section
  • Main doorPainted hardwood

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 99, GurugramSector 99, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.5 km
  • Delhi–Gurugram–SNB RRTS5.6 km
  • Sohna Elevated Corridor (NH-248A)7.3 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 4 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 3
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is Laxmi Apartments registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as 25 OF 2017, registered on 27 Jul 2017. Ended 14 Sep 2020. The register shows it as: Registration expired.

The source ↗
What is the possession timeline for Laxmi Apartments?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Jun 2022. Its registration runs to 14 Sep 2020; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Laxmi Apartments?From the records · Map pin and road lines, read 6 Sep 2026

Laxmi Apartments is in Sector 99, Gurugram; the site address declared to HARERA is Village Gopal Pur, Sector-99, Gurugram. In a straight line it is about 0.5 km from Dwarka Expressway, 5.6 km from Delhi–Gurugram–SNB RRTS and 7.3 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Laxmi Apartments?From the records · HARERA, read 4 Nov 2026

Laxmi Apartments is a Pareena Infrastructures project, registered by its company PAREENA INFRASTRUCTURE PVT. LTD..

The source ↗Pareena Infrastructures's projects and court record

The records

What the registers hold for Laxmi Apartments: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration 25 OF 2017: Registration expired. Ended 14 Sep 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 106 OF 2014 is on the DTCP register: Licence lapsed; the register prints its validity to 30 Jul 2024.DTCP, read 3 Nov 2026
The court record of Pareena Infrastructures’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Registration expired

    Ended 14 Sep 2020. HARERA Gurugram, read 4 Nov 2026. Source

  • Red flag: Licence 106 OF 2014 lapsed

    Named in this project’s application. Valid to 30 Jul 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 10 HARERA files, with the dates we read them
Registration no.
25 OF 2017
Registration date
27 Jul 2017
Registration valid till
14 Sept 2020
Declared possession
30 Jun 2022

Declared by the promoter to HARERA

Land area
5 (Acre) (20,234.28 sq m)
FAR
the application prints 225, which is not a ratio
licence
license no 106 of 2014 dated 14-08-2014
Estimated project cost
₹135.56 crore
Cost of land
₹30.95 crore
Completion declared for
30 Jun 2022
Declared inventory · 3 types

Declared inventory

  • APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-1 · 402 units · 42.135 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-2 · 402 units · 39.468 sq m carpet · one flat
  • APARTMENT/SHOPS/OTHER BUILDINGS Type TYPE-3 · 33 units · 59.38 sq m carpet · one flat
Statutory approvals, as declared · 6

Statutory approvals, as declared

  • I. BUILDING APPROVAL PLAN — declared: already been obtained (25 Jul 2015)
  • II. ENVIRONMENTAL CLEARANCE — declared: already been obtained (15 Mar 2016)
  • III. CTE — declared: already been obtained (7 Dec 2016)
  • IV. FOREST NOC — declared: already been obtained (20 Oct 2015)
  • V. ARVALI NOC — declared: already been obtained (30 Oct 2015)
  • VI. HEIGHT NOC — declared: already been obtained (30 Oct 2015)
On file with HARERA · 10 files

On file with HARERA (10)

Plans

Site plan

1 file
Approved Site Plan16 Jan 2020

Layout plan

1 file
Latest Layout Plan16 Jan 2020

Zoning plan

1 file
Zoning Plan16 Jan 2020

Demarcation plan

1 file
Demarcation Plan16 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set16 Jan 2020

Approvals and clearances

Occupation certificate (OC)

2 files
OC uploaded8 Aug 2023OC uploaded4 Aug 2023

DTCP licence

1 file
Licence Copy with Land Schedule16 Jan 2020

Money

Accounts and finance

1 file
Non-Default Certificate from a CA16 Jan 2020

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit16 Jan 2020

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

106 OF 2014 · Pareena Infrastructure Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 30 Jul 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 16 Jan 2020 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

106 OF 2014: 6 parcels, 5 acres in all, in Gopalpur (hadbast 47), tehsil Harsaru.

The licence register prints the same licensed area, 5 acres.

  • 35//25 min4 kanal 2 marla
  • 44//218 kanal
  • 44//228 kanal
  • 44//238 kanal
Show the other 2 parcels
  • 31//37 kanal 2 marla
  • 31//4/14 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Gopalpur (hadbast 47), tehsil Harsaru. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 35//25 min.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,000 per sq ft

Sector 99, collector rates effective 1 Apr 2026, Kadipur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan16 Jan 2020

Layout plan

1 file
Latest Layout Plan16 Jan 2020

Building plans

1 file
Approved Building Plans, Full Set16 Jan 2020

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (10 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1186 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Pareena Infrastructures

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.