Under construction

M3M Paragon 57

by M3M India · Sector 57, Gurugram

Not on our price list yet

Possession 31 Aug 2026 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 57, Gurugram4.0 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
about 394 sq ft
In m²about 36.6 m², the average flat, as declared
Registered by
PARYAPT INFRASTRUCTUREPRIVATE LIMITEDthe company that filed it, for M3M India
Timeline
  1. 1 Dec 2022Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 31 Aug 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 30 Aug 2027Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside3.16 acres in all, by use
  • Apartment buildings1.892 acres · 60%
  • Roads0.763 acres · 24%
  • Other uses0.505 acres · 16%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningProvision in retail & common area NON a/C
  • KitchenStudio- OBD / emulsion or as approved
  • LiftsPassenger lifts and service lifts
  • FloorsBARE R.C.C SLAB, studio- tile / stone or as approved
  • WallsLevel plast / white putty ,studio - OBD / emulsion or as approved
  • WindowsStudio-SGU / DGU with aluminium frame or as per design
  • Main doorAluminium and glass for retail or as approved ,studio-laminated / veneer / polished flush door shutter or as approved
  • Electrical fittingsLED type fitting

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 57, GurugramSector 57, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)4.0 km
  • Delhi–Gurugram–SNB RRTS4.9 km
  • Dwarka ExpresswayOpen, 17 Aug 20258.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 13 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 4
  • Registered, no OC or CC yet: 9

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is M3M Paragon 57 registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/651/383/2022/126. Valid to 30 Aug 2027.

The source ↗
What is the possession timeline for M3M Paragon 57?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Aug 2026. Its registration runs to 30 Aug 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around M3M Paragon 57?From the records · Map pin and road lines, read 6 Sep 2026

M3M Paragon 57 is in Sector 57, Gurugram; the site address declared to HARERA is Block A Sushant Lok- Iii, Sector-57 Gurugram Manesar Urban Complex. In a straight line it is about 4.0 km from Sohna Elevated Corridor (NH-248A), 4.9 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building M3M Paragon 57?From the records · HARERA, read 4 Nov 2026

M3M Paragon 57 is a M3M India project, registered by its company PARYAPT INFRASTRUCTUREPRIVATE LIMITED.

The source ↗M3M India's projects and court record

The records

What the registers hold for M3M Paragon 57: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/651/383/2022/126: Registered. Valid to 30 Aug 2027.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Licence 16 OF 1996, as the developer typed it: no match in the registers searched.Declared to HARERA, read 29 Oct 2026
  • Plans approved, as the developer declared: layout plan 1 Dec 2022, building plans 1 Dec 2022.Declared to HARERA, read 29 Oct 2026
The court record of M3M India’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 54 HARERA files, with the dates we read them
Registration no.
GGM/651/383/2022/126
Registration valid till
30 Aug 2027
Declared possession
31 Aug 2026

Declared by the promoter to HARERA

Land area
3.16 (Acre) (12,788.07 sq m)
FAR
3.66 proposed of 3.67 permissible
licence
10 to 16 of 1996 dated 16.02.1996, 3 to 5 and 8 of 1999 dated 4.01.1999, 2 to 4 of 2000 dated 6.02.2000, 102 to 114 of 2004 dated 27.07.2004
Estimated project cost
₹561.01 crore
Cost of land
₹140.71 crore
Layout plan, declared approved (field 5a)
1 Dec 2022
Building plans, declared approved
1 Dec 2022
Construction to start
1 Dec 2022
Completion declared for
31 Aug 2026
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 858 units · 31,415.28 sq m carpet · total for 858 flats, about 36.6 m² each
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LOI — declared: already been obtained (20 Dec 2021)
  • II. NOC FOR HEIGHT CLEARANCE — declared: already been obtained (29 Nov 2021)
  • III. ENVIRONMENT CLEARANCE — declared: already been obtained (25 Mar 2022)
  • IV. BUILDING PLAN APPROVAL — declared: already been obtained (1 Dec 2022)
On file with HARERA · 54 files

On file with HARERA (54)

Plans

Site plan

2 files
Approved Site Plan2 Dec 2022Site Plan Services2 Dec 2022

Layout plan

1 file
Latest Layout Plan28 Nov 2022

Zoning plan

1 file
Zoning Plan1 Dec 2022

Building plans

9 files
1st Basement Structure Plan7 Dec 2022Ground Floor Structure Plan7 Dec 2022Second Floor Structure Plan7 Dec 2022

Floor plans

10 files
Fourth Floor Plan2 Dec 20221st Basement Plan2 Dec 2022Third Floor Plan2 Dec 2022

Services

Sewerage and drainage

4 files
Assurance Sewage Water17 Dec 2022Sewer Layout Plan7 Dec 2022Strom Water Plan7 Dec 2022Assurance Strom Water24 Nov 2022

Water supply

3 files
Water Supply Plan7 Dec 2022Assurance Drinking Water2 Dec 2022Assurance Construction Water24 Nov 2022

Electricity

2 files
Electrical Load Assurance16 Dec 2022Electrical & Street Light Plan7 Dec 2022

Roads

1 file
Road Layout Plan7 Dec 2022

Landscape and green areas

1 file
Landscape Plan1 Dec 2022

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule2 Dec 2022

Environment clearance

1 file
Environment Clearance24 Nov 2022

Fire safety

11 files
First Floor- Fire Plan 515 Dec 2022Site Plan- Fire Plan 115 Dec 20221st Basement - Fire Plan 215 Dec 2022

Other NOCs and clearances

1 file
AAI NOC24 Nov 2022

Money

Accounts and finance

3 files
Non-Default Certificate from a CA1 Dec 2022Cash Flow Statement1 Dec 2022CA Certificate on the Application’s Figures1 Dec 2022

Timeline and progress

Construction schedule

1 file
PERT Chart17 Dec 2022

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit2 Dec 2022

HARERA’s orders

HARERA’s orders

1 file
Project Extension No. 16 of 2026 Dated 23.07.202618 Aug 2026

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 4 DTCP licences named on the application

The promoter declared 16 OF 1996. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 8 OF 1999. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 4 OF 2000. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

The promoter declared 114 OF 2004. We could not match that to exactly one row on the department’s register, so nothing is claimed about it here.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 2 Dec 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate, commercial property
₹3,39,800 per sq yd

Sector 57, collector rates effective 1 Apr 2026, Wazirabad tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Approved Site Plan2 Dec 2022Site Plan Services2 Dec 2022

Layout plan

1 file
Latest Layout Plan28 Nov 2022

Building plans

9 files
1st Basement Structure Plan7 Dec 2022Ground Floor Structure Plan7 Dec 2022Second Floor Structure Plan7 Dec 2022Typical Floor Structure Plan7 Dec 2022Elevation 12 Dec 2022Section Plan2 Dec 2022

Floor plans

10 files
Fourth Floor Plan2 Dec 20221st Basement Plan2 Dec 2022Third Floor Plan2 Dec 2022Second Floor Plan2 Dec 20226TH, 8TH, 10TH, 11th & 13th Floor Plan2 Dec 2022Parking Plan2 Dec 2022

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (54 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/1897 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on M3M India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.