SAPPHIRE57
by Ameya Commercial Projects · Sector 57, Gurugram
Not on our price list yet
Possession 30 Apr 2026 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 57, Gurugram4.0 km from Sohna Elevated Corridor (NH-248A), in a straight line
- Registered by
- AMEYA COMMERCIAL PROJECTS PVT LTD.the company that filed it, for Ameya Commercial Projects
- 17 Aug 2021Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Apr 2026Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft283–684 sq ft67
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft. Left out: 75 rows of a single unit and 35 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Apartment buildings3,469 m² · 53%
- Roads1,817 m² · 28%
- Pavements644 m² · 10%
- Green belts570 m² · 9%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- LiftsKONE/johnson/OTIS
- FloorsVitrified tiles
- WallsAsian paint or equivalent
- BathroomsKohler or equivalent
- WindowsSaint gobin or equivalent glass
- Main doorGlass doors
- Electrical fittingsPolycab/havelles
- Water storageRCC/PVC
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)4.0 km
- Delhi–Gurugram–SNB RRTS4.9 km
- Dwarka ExpresswayOpen, 17 Aug 20258.9 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Registered, no OC or CC yet: 1
- Other register states: 4
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | M3M India | Same sector | Under construction | — | 31 Aug 2026 |
M3M ATRIUM57No photo on file yet | Paryapt Infrastructure | Same sector | — | — | 15 May 2025 |
No photo of the project on file yet | S & M Developers | 1.5 kmto its sector’s point | — | — | 31 Dec 2026 |
No photo of the project on file yet | S & M Developers | 1.5 kmto its sector’s point | — | — | 31 Dec 2025 |
No photo of the project on file yet | Pioneer Urban Land & Infrastructure | 1.8 kmto its sector’s point | — | — | 1 Jan 2034 |
Commercial ColonyNo photo on file yet | Plus Projects | 1.8 kmto its sector’s point | — | — | — |
| Advance India Projects | 1.8 kmto its sector’s point | — | — | — | |
| Emaar MGF Land | 1.8 kmto its sector’s point | — | — | 31 Dec 2022 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is SAPPHIRE57 registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/526/258/2022/01. The register’s record shows an end date of 30 Apr 2026. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for SAPPHIRE57?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Apr 2026. Its registration runs to 30 Apr 2026; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around SAPPHIRE57?From the records · Map pin and road lines, read 6 Sep 2026
SAPPHIRE57 is in Sector 57, Gurugram; the site address declared to HARERA is Sector 57. In a straight line it is about 4.0 km from Sohna Elevated Corridor (NH-248A), 4.9 km from Delhi–Gurugram–SNB RRTS and 8.9 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building SAPPHIRE57?From the records · HARERA, read 4 Nov 2026
SAPPHIRE57 is a Ameya Commercial Projects project, registered by its company AMEYA COMMERCIAL PROJECTS PVT LTD..
The source ↗Ameya Commercial Projects's projects and court recordThe records
What the registers hold for SAPPHIRE57: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/526/258/2022/01: Registration lapsed. The register’s record shows an end date of 30 Apr 2026.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 24 OF 2021 is on the DTCP register: Licence lapsed; the register prints its validity to 23 May 2026.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 17 Aug 2021, building plans 17 Aug 2021.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 23 HARERA files, with the dates we read them
- Registration no.
- GGM/526/258/2022/01
- Registration valid till
- 30 Apr 2026
- Declared possession
- 30 Apr 2026
Declared by the promoter to HARERA
- Land area
- 1.60625 (Acre) (6,500.26 sq m)
- FAR
- 1.75 proposed of 1.75 permissible
- licence
- 24 of 2021 dated 24.05.2021
- Estimated project cost
- ₹77.44 crore
- Cost of land
- ₹12.42 crore
- Layout plan, declared approved (field 5a)
- 17 Aug 2021
- Building plans, declared approved
- 17 Aug 2021
- Construction to start
- 16 Nov 2021
- Completion declared for
- 30 Apr 2026
Declared inventory · 161 types
Declared inventory — 161 types declared, first 8 shown
- Apartment/Shops/Other Buildings · 1 unit · 28.67 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 30.59 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 39.45 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 39.51 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 42.15 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 42.38 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 42.74 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 44.02 sq m carpet · 1 tower · one flat
Statutory approvals, as declared · 1
Statutory approvals, as declared
- I. LICENSE — declared: already been obtained (1 Jun 2021)
On file with HARERA · 23 files
On file with HARERA (23)
Plans
Site plan
1 fileLayout plan
2 filesZoning plan
1 fileDemarcation plan
1 fileBuilding plans
4 filesFloor plans
1 fileServices
Sewerage and drainage
1 fileWater supply
2 filesElectricity
1 fileRoads
1 fileService plans
1 fileApprovals and clearances
DTCP licence
1 fileFire safety
1 fileLand records
Land records
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
24 OF 2021 · Ameya Commercial Projects Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 23 May 2026
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 4 Oct 2021 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
24 OF 2021: 2 parcels, 1.6062 acres in all, in Wazirabad (hadbast 75), tehsil Wazirabad.
The licence register prints the same licensed area, 1.6063 acres.
- rectangle 936, kila 936/2/19 biswa
- rectangle 936, kila 936/1/22 bigha 2 biswa 8 biswansi
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Wazirabad (hadbast 75), tehsil Wazirabad. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as rectangle 936, kila 936/2/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
2 filesBuilding plans
4 filesFloor plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (23 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1683 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Ameya Commercial Projects
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.