Mercado
by Elan Group · Sector 80, Gurugram
Not on our price list yet
Possession 6 Dec 2019 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 80, Gurugram0.9 km from Delhi–Gurugram–SNB RRTS, in a straight line
- Registered by
- ELAN LIMITEDthe company that filed it, for Elan Group
- 14 Sep 2017Registered with HARERAHARERA, read 3 Nov 2026
- 8 May 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 6 Dec 2019Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 13 Sep 2022Registration valid toHARERA, read 3 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Parking1.163 acres · 39%
- Green belts0.877 acres · 29%
- Roads0.649 acres · 22%
- Pavements0.186 acres · 6%
- Sewage and waste treatment0.061 acres · 2%
- Electricity sub-station0.051 acres · 2%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningSplit AC for apartments centralised screw chiller for cinemas
- KitchenKitchen ATE with granite counters PLY cabinet with laminate finish
- LiftsMitsubishi (lift) OTIS (escalator)
- WardrobesPLY wood & board with laminated finish
- FloorsVitrified tiles
- WallsOBD
- BathroomsCP-fittinga-G ROHE/jaqar chinaware - ROCK/american standard
- WindowsGlass window with aluminium frame
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS0.9 km
- Dwarka ExpresswayOpen, 17 Aug 20254.8 km
- Sohna Elevated Corridor (NH-248A)8.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 4
- Registered, no OC or CC yet: 7
- Other register states: 1
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| Conscient Infrastructure | Same sector | Under construction | — | 31 Dec 2031 | |
| Trehan Iris | Same sector | New launch | ₹18,000/sq ft | 31 Dec 2032 | |
ELAIRA RESIDENCES PHASE - 2 & 2ANo photo on file yet | Conscient Infrsatructure | Same sector | — | — | 31 Dec 2032 |
| Eldeco Group | Same sector | New launch | ₹14,500/sq ft | 15 Jan 2031 | |
![]() | Sobha | Same sector | Under construction | ₹26,000/sq ft | 31 Dec 2030 |
| Conscient Infrastructure | Same sector | Under construction | ₹15,500/sq ft | 28 Feb 2030 | |
| Eldeco Group | Same sector | Under construction | ₹14,500/sq ft | 31 Dec 2030 | |
PALM COUNTYNo photo on file yet | Conmin Infradevelopers | 0.9 kmto its sector’s point | — | — | 5 Mar 2027 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Mercado registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as 189 OF 2017, registered on 14 Sep 2017. Ended 13 Sep 2022. The register shows it as: Registration expired.
The source ↗What is the possession timeline for Mercado?From the records · HARERA, read 3 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 6 Dec 2019. Its registration runs to 13 Sep 2022; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Mercado?From the records · Map pin and road lines, read 6 Sep 2026
Mercado is in Sector 80, Gurugram; the site address declared to HARERA is Village Naurangpur, Sector- 80. In a straight line it is about 0.9 km from Delhi–Gurugram–SNB RRTS, 4.8 km from Dwarka Expressway and 8.8 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Mercado?From the records · HARERA, read 3 Nov 2026
Mercado is a Elan Group project, registered by its company ELAN LIMITED.
The source ↗Elan Group's projects and court recordThe records
What the registers hold for Mercado: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 189 OF 2017: Registration expired. Ended 13 Sep 2022.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Land licence 82 OF 2009 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 7 Dec 2019.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 8 May 2019, building plans 8 May 2019.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Red flag: Registration expired
Ended 13 Sep 2022. HARERA Gurugram, read 3 Nov 2026. Source
Amber flag: Licence 82 OF 2009 validity ended
Named in this project’s application. Valid to 7 Dec 2019. The register links a completion certificate (LC-IX), dated 31 Jan 2025, against this licence. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 44 HARERA files, with the dates we read them
- Registration no.
- 189 OF 2017
- Registration date
- 14 Sept 2017
- Registration valid till
- 13 Sept 2022
- Declared possession
- 6 Dec 2019
Declared by the promoter to HARERA
- Land area
- 2.9875 (Acre) (12,089.98 sq m)
- FAR
- 4.86 proposed of 4.87 permissible
- licence
- 82 OF 2009 DATED 08.12.2009
- Estimated project cost
- ₹166.07 crore
- Cost of land
- ₹32.40 crore
- Layout plan, declared approved (field 5a)
- 8 May 2019
- Building plans, declared approved
- 8 May 2019
- Completion declared for
- 6 Dec 2019
Declared inventory · 1 type
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type · 531 units
Statutory approvals, as declared · 4
Statutory approvals, as declared
- I. APPROVAL OF REVISED BUILDING PLAN — declared: already been obtained (8 May 2019)
- II. APPROVAL OF SERVICE ESTIMATES — declared: applied for but yet to receive
- III. APPROVAL OF FIRE NOC — declared: applied for but yet to receive
- IV. OCCUPATION CERTIFICATE — declared: yet to file for approval
On file with HARERA · 44 files
On file with HARERA (44)
Plans
Site plan
2 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
7 filesFloor plans
13 filesServices
Service plans
1 fileApprovals and clearances
Occupation certificate (OC)
1 fileCompletion certificate (CC)
1 fileDTCP licence
3 filesEnvironment clearance
1 fileFire safety
1 fileOther NOCs and clearances
1 fileLand records
Land records
1 fileSales papers
Allotment and sale agreements
1 fileMoney
Accounts and finance
6 filesThe promoter’s papers
Declarations and affidavits
1 fileCompany papers
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
82 OF 2009 · RP Estates · GURGAON-MANESAR
Licence valid to 7 Dec 2019
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 18 Dec 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
82 OF 2009: 12 parcels, 2.9875 acres in all, in Nurangpur (hadbast 157), tehsil Manesar.
The licence register prints the same licensed area, 2.99 acres.
- 3//25/2/112 marla
- 3//25/2/2/12 marla
- 3//25/2/2/2/19 marla
- 3//25/2/2/2/212 marla
Show the other 8 parcels
- 4//5/22 kanal 8 marla
- 4//6/114 marla
- 4//6/24 kanal 18 marla
- 5//1/14 marla
- 5//1/22 kanal 12 marla
- 5//10/14 kanal 12 marla
- 5//10/23 kanal 8 marla
- 5//11/13 kanal 7 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Nurangpur (hadbast 157), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 3//25/2/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, commercial property
- ₹1,91,700 per sq yd
this sector, collector rates effective 1 Apr 2026, Manesar tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
7 filesFloor plans
13 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (44 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1001 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Elan Group
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.