Sector 42, Gurugram5.2 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
3,098–4,204 sq ft
In m²about 288–391 m², as declared
Registered by
EXPERION DEVELOPERS PRIVATE LIMITEDthe company that filed it, for Experion Developers
Timeline
  1. 10 Oct 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Dec 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026
  3. 31 Dec 2034Registration valid toHARERA, read 4 Nov 2026

Homes on offer

The homes the developer declared to HARERA, by size.

110homes, 3,098 to 4,204 sq ft of carpet area
  • 3,000 sq ft and above3,098–4,204 sq ft110

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside3.426 acres in all, by use
  • Pavements1.13 acres · 33%
  • Roads0.86 acres · 25%
  • Apartment buildings0.82 acres · 24%
  • Green belts0.52 acres · 15%
  • Electricity sub-station0.06 acres · 2%
  • Sewage and waste treatment0.036 acres · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRV with suitable IDU as per design
  • KitchenAnti skid vitrified tiles / stone, vitrified tiles up to height as per design false ceiling with acrylic emulsion paint, prefabricated modular door with frame or flush door with laminate / paint and hardwood frame, aluminium/ UPVC
  • LiftsTwo towers with 2 to a CORE, total 44 NOS. flats in both the towers, one tower with 1 FLAT at each floor, total 22 flats. total no. of flats = 110 NOS. (2*44+22)
  • WardrobesPrefabricated modular door with frame or flush door with laminate / paint and hardwood frame.
  • FloorsImported marble, laminated wooden flooring / hardwood floor / engineered wooden floor, anti skid vitrified tiles / stone, ceramic tile
  • WallsVitrified tile upto false ceiling / stone, vitrified tiles up to height as per design,
  • BathroomsVitrified tile upto false ceiling / stone
  • WindowsDouble closing unit prfomance glass

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 42, GurugramSector 42, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS5.2 km
  • Sohna Elevated Corridor (NH-248A)7.4 km
  • Dwarka ExpresswayOpen, 17 Aug 20258.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 17 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 11
  • Registered, no OC or CC yet: 3
  • Other register states: 3

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is ONE42 GOLF COURSE ROAD registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/893/625/2024/120. Valid to 31 Dec 2034.

The source ↗
What is the possession timeline for ONE42 GOLF COURSE ROAD?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Dec 2032. Its registration runs to 31 Dec 2034; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around ONE42 GOLF COURSE ROAD?From the records · Map pin and road lines, read 6 Sep 2026

ONE42 GOLF COURSE ROAD is in Sector 42, Gurugram; the site address declared to HARERA is Plot No. Gh-1 , Sector 42, Gurugram. In a straight line it is about 5.2 km from Delhi–Gurugram–SNB RRTS, 7.4 km from Sohna Elevated Corridor (NH-248A) and 8.8 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building ONE42 GOLF COURSE ROAD?From the records · HARERA, read 4 Nov 2026

ONE42 GOLF COURSE ROAD is a Experion Developers project, registered by its company EXPERION DEVELOPERS PRIVATE LIMITED.

The source ↗Experion Developers's projects and court record

The records

What the registers hold for ONE42 GOLF COURSE ROAD: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/893/625/2024/120: Registered. Valid to 31 Dec 2034.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Plans approved, as the developer declared: building plans 10 Oct 2024.Declared to HARERA, read 29 Oct 2026
The court record of Experion Developers’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 65 HARERA files, with the dates we read them
Registration no.
GGM/893/625/2024/120
Registration valid till
31 Dec 2034
Declared possession
30 Dec 2032

Declared by the promoter to HARERA

Land area
3.426 (Acre) (13,864.53 sq m)
FAR
3.61 proposed of 3.62 permissible
licence
Plot No. GH-1 vide Memo No. ZO002/EO018/UE029/GALOT/0000001411 dated 21.12.2023 Allotted by the HSVP and Conveyance Deed was executed on dated 16.09.2024, Vasika No. 12040.
Estimated project cost
₹1055.65 crore
Cost of land
₹345.08 crore
Building plans, declared approved
10 Oct 2024
Construction to start
1 Jan 2026
Completion declared for
30 Dec 2032
Declared inventory · 6 types

Declared inventory

  • Apartment/Shops/Other Buildings · 22 units · 390.55 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 44 units · 287.83 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 44 units · 287.83 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 1 unit · 14.43 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 15.42 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
  • Apartment/Shops/Other Buildings · 1 unit · 14.76 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 11

Statutory approvals, as declared

  • I. BUILDING PLAN — declared: already been obtained (10 Oct 2024)
  • II. AAI — declared: already been obtained (14 Aug 2023)
  • III. ASSURANCE OF WATER SUPPLY — declared: already been obtained (29 Mar 2024)
  • IV. ASSURANCE FOR SEWERAGE CONNECTION — declared: already been obtained (27 Mar 2024)
  • V. ASSURANCE FOR STORM WATER — declared: already been obtained (27 Mar 2024)
  • VI. ELECTRICAL LOAD — declared: already been obtained (26 Jul 2024)
  • VII. HUDA CONSTRUCTION — declared: already been obtained (30 Jul 2024)
  • VIII. LOI — declared: already been obtained (12 Jul 2023)
  • IX. ALLOTMENT LETTER - PLOT NO. GH-1 VIDE MEMO NO. ZO002/EO018/UE029/GALOT/0000001411, ALLOTTED BY THE HSVP — declared: already been obtained (21 Dec 2023)
  • X. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive
  • XI. FIRE SCHEME APPROVAL — declared: applied for but yet to receive
On file with HARERA · 65 files

On file with HARERA (65)

Plans

Site plan

4 files
Site Plan (Green Area)10 Dec 2024Site Plan (Services)10 Dec 2024Site Plan10 Dec 2024Approved Site Plan15 Oct 2024

Layout plan

1 file
Latest Layout Plan15 Oct 2024

Zoning plan

1 file
Zoning Plan14 Oct 2024

Demarcation plan

1 file
Demarcation Plan14 Oct 2024

Building plans

14 files
Elevation-1 Tower A10 Dec 2024Elevation-2 Tower A10 Dec 2024Elevation-3 Tower B10 Dec 2024

Floor plans

11 files
Basement-03 Floor Plan and Area Diagram10 Dec 2024Basement-01 Floor Plan and Area Diagram10 Dec 20242nd Floor Plan Community Building10 Dec 2024

Services

Sewerage and drainage

2 files
Assuance for Sewerage Connection12 Oct 2024Assuance for Storm Water12 Oct 2024

Water supply

1 file
Assurance of Water Supply12 Oct 2024

Electricity

1 file
Electrical Load Assurance12 Oct 2024

Service plans

1 file
Service Plans on the Layout15 Oct 2024

Approvals and clearances

Completion certificate (CC)

1 file
Section-CC Tower A10 Dec 2024

DTCP licence

2 files
LOI12 Oct 2024Licence Copy with Land Schedule12 Oct 2024

Other NOCs and clearances

1 file
AAI NOC12 Oct 2024

Land records

Land records

2 files
Revenue Record Entry of Licence and Collaboration15 Oct 2024Aks-Sizra12 Oct 2024

Sales papers

Allotment and sale agreements

2 files
Conveyance Deed15 Oct 2024Possession Letter12 Oct 2024

Money

Accounts and finance

11 files
Edpl Standalone Financials March 2024 Bw Signed10 Dec 2024Edpl BALANCESHEETMARCH2310 Dec 2024Edpl Balance Sheet 202210 Dec 2024

The promoter’s papers

Declarations and affidavits

2 files
Undertaking Bank10 Dec 2024The Promoter’s Declaration on Affidavit15 Oct 2024

Company papers

1 file
MOA and AOA10 Dec 2024

HARERA’s orders

HARERA’s orders

1 file
Addendum to the Registration Certificate-Revision in Building Plans3 Feb 2026

Other filings

Other filings

5 files
Ground Coverage Area Diagram10 Dec 2024SCAN164910 Dec 2024SCAN165710 Dec 2024

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

The promoter declared Plot No. GH-1 vide Memo No. ZO002/EO018/UE029/GALOT/0000001411 dated 21.12.2023 Allotted by the HSVP and Conveyance Deed was executed on dated 16.09.2024, Vasika No. 12040.. We could not read a licence number from that, so nothing is claimed about it here.

declared in the registration application (Form REP-I), Gurugram bench · submitted 15 Oct 2024 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Site Plan (Green Area)10 Dec 2024Site Plan (Services)10 Dec 2024Site Plan10 Dec 2024Approved Site Plan15 Oct 2024

Layout plan

1 file
Latest Layout Plan15 Oct 2024

Building plans

14 files
Elevation-1 Tower A10 Dec 2024Elevation-2 Tower A10 Dec 2024Elevation-3 Tower B10 Dec 2024Elevation-4 Tower C10 Dec 2024Elevation-5 Tower C10 Dec 2024Elevation-7 Tower C10 Dec 2024

Floor plans

11 files
Basement-03 Floor Plan and Area Diagram10 Dec 2024Basement-01 Floor Plan and Area Diagram10 Dec 20242nd Floor Plan Community Building10 Dec 2024Combine Floor Plan of 3rd Floor (Tower A, B and C)10 Dec 2024First Floor Area Diagram10 Dec 2024First Floor Plan Community Building10 Dec 2024

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (65 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3145 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Experion Developers

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.