ONE42 GOLF COURSE ROAD
by Experion Developers · Sector 42, Gurugram
Not on our price list yet
Possession 30 Dec 2032 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 42, Gurugram5.2 km from Delhi–Gurugram–SNB RRTS, in a straight line
- Registered by
- EXPERION DEVELOPERS PRIVATE LIMITEDthe company that filed it, for Experion Developers
- 10 Oct 2024Building plans approveddeclared to HARERA, read 29 Oct 2026
- 30 Dec 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026
- 31 Dec 2034Registration valid toHARERA, read 4 Nov 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 3,000 sq ft and above3,098–4,204 sq ft110
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Pavements1.13 acres · 33%
- Roads0.86 acres · 25%
- Apartment buildings0.82 acres · 24%
- Green belts0.52 acres · 15%
- Electricity sub-station0.06 acres · 2%
- Sewage and waste treatment0.036 acres · 1%
The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.
- Air-conditioningVRV with suitable IDU as per design
- KitchenAnti skid vitrified tiles / stone, vitrified tiles up to height as per design false ceiling with acrylic emulsion paint, prefabricated modular door with frame or flush door with laminate / paint and hardwood frame, aluminium/ UPVC
- LiftsTwo towers with 2 to a CORE, total 44 NOS. flats in both the towers, one tower with 1 FLAT at each floor, total 22 flats. total no. of flats = 110 NOS. (2*44+22)
- WardrobesPrefabricated modular door with frame or flush door with laminate / paint and hardwood frame.
- FloorsImported marble, laminated wooden flooring / hardwood floor / engineered wooden floor, anti skid vitrified tiles / stone, ceramic tile
- WallsVitrified tile upto false ceiling / stone, vitrified tiles up to height as per design,
- BathroomsVitrified tile upto false ceiling / stone
- WindowsDouble closing unit prfomance glass
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Delhi–Gurugram–SNB RRTS5.2 km
- Sohna Elevated Corridor (NH-248A)7.4 km
- Dwarka ExpresswayOpen, 17 Aug 20258.8 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 11
- Registered, no OC or CC yet: 3
- Other register states: 3
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
| DLF | 1.6 kmto its sector’s point | — | — | 30 Jun 2026 | |
| DLF | 1.6 kmto its sector’s point | — | — | 31 Dec 2025 | |
| DLF | 1.6 kmto its sector’s point | — | — | 31 Dec 2031 | |
| Godrej Highview | 1.6 kmto its sector’s point | Under construction | ₹30,000/sq ft | 16 Oct 2031 | |
| Godrej Highview | 1.9 kmto its sector’s point | New launch | ₹28,000/sq ft | 30 Sep 2032 | |
No photo of the project on file yet | Tulip Infratech | 1.9 kmto its sector’s point | Under construction | — | 17 May 2022 |
DALCORE THE FALCONNo photo on file yet | Ahir Infraspace | 1.9 kmto its sector’s point | — | — | 31 Mar 2031 |
| Godrej Highview | 1.9 kmto its sector’s point | New launch | ₹31,000/sq ft | 31 Aug 2033 |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is ONE42 GOLF COURSE ROAD registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/893/625/2024/120. Valid to 31 Dec 2034.
The source ↗What is the possession timeline for ONE42 GOLF COURSE ROAD?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 30 Dec 2032. Its registration runs to 31 Dec 2034; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around ONE42 GOLF COURSE ROAD?From the records · Map pin and road lines, read 6 Sep 2026
ONE42 GOLF COURSE ROAD is in Sector 42, Gurugram; the site address declared to HARERA is Plot No. Gh-1 , Sector 42, Gurugram. In a straight line it is about 5.2 km from Delhi–Gurugram–SNB RRTS, 7.4 km from Sohna Elevated Corridor (NH-248A) and 8.8 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building ONE42 GOLF COURSE ROAD?From the records · HARERA, read 4 Nov 2026
ONE42 GOLF COURSE ROAD is a Experion Developers project, registered by its company EXPERION DEVELOPERS PRIVATE LIMITED.
The source ↗Experion Developers's projects and court recordThe records
What the registers hold for ONE42 GOLF COURSE ROAD: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/893/625/2024/120: Registered. Valid to 31 Dec 2034.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Plans approved, as the developer declared: building plans 10 Oct 2024.Declared to HARERA, read 29 Oct 2026
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 65 HARERA files, with the dates we read them
- Registration no.
- GGM/893/625/2024/120
- Registration valid till
- 31 Dec 2034
- Declared possession
- 30 Dec 2032
Declared by the promoter to HARERA
- Land area
- 3.426 (Acre) (13,864.53 sq m)
- FAR
- 3.61 proposed of 3.62 permissible
- licence
- Plot No. GH-1 vide Memo No. ZO002/EO018/UE029/GALOT/0000001411 dated 21.12.2023 Allotted by the HSVP and Conveyance Deed was executed on dated 16.09.2024, Vasika No. 12040.
- Estimated project cost
- ₹1055.65 crore
- Cost of land
- ₹345.08 crore
- Building plans, declared approved
- 10 Oct 2024
- Construction to start
- 1 Jan 2026
- Completion declared for
- 30 Dec 2032
Declared inventory · 6 types
Declared inventory
- Apartment/Shops/Other Buildings · 22 units · 390.55 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 44 units · 287.83 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 44 units · 287.83 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 1 unit · 14.43 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 15.42 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
- Apartment/Shops/Other Buildings · 1 unit · 14.76 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 11
Statutory approvals, as declared
- I. BUILDING PLAN — declared: already been obtained (10 Oct 2024)
- II. AAI — declared: already been obtained (14 Aug 2023)
- III. ASSURANCE OF WATER SUPPLY — declared: already been obtained (29 Mar 2024)
- IV. ASSURANCE FOR SEWERAGE CONNECTION — declared: already been obtained (27 Mar 2024)
- V. ASSURANCE FOR STORM WATER — declared: already been obtained (27 Mar 2024)
- VI. ELECTRICAL LOAD — declared: already been obtained (26 Jul 2024)
- VII. HUDA CONSTRUCTION — declared: already been obtained (30 Jul 2024)
- VIII. LOI — declared: already been obtained (12 Jul 2023)
- IX. ALLOTMENT LETTER - PLOT NO. GH-1 VIDE MEMO NO. ZO002/EO018/UE029/GALOT/0000001411, ALLOTTED BY THE HSVP — declared: already been obtained (21 Dec 2023)
- X. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive
- XI. FIRE SCHEME APPROVAL — declared: applied for but yet to receive
On file with HARERA · 65 files
On file with HARERA (65)
Plans
Site plan
4 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
14 filesFloor plans
11 filesServices
Sewerage and drainage
2 filesWater supply
1 fileElectricity
1 fileService plans
1 fileApprovals and clearances
Completion certificate (CC)
1 fileDTCP licence
2 filesOther NOCs and clearances
1 fileLand records
Land records
2 filesSales papers
Allotment and sale agreements
2 filesMoney
Accounts and finance
11 filesThe promoter’s papers
Declarations and affidavits
2 filesCompany papers
1 fileHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
5 filesThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
The promoter declared Plot No. GH-1 vide Memo No. ZO002/EO018/UE029/GALOT/0000001411 dated 21.12.2023 Allotted by the HSVP and Conveyance Deed was executed on dated 16.09.2024, Vasika No. 12040.. We could not read a licence number from that, so nothing is claimed about it here.
declared in the registration application (Form REP-I), Gurugram bench · submitted 15 Oct 2024 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Collector rate
No one collector rate can be matched to this project's type.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
4 filesLayout plan
1 fileBuilding plans
14 filesFloor plans
11 filesAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (65 in all), none is a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/3145 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Experion Developers
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.
