Skip to content

PLATINA STREET 109

by Ishv Realtors · Sector 109, Gurugram

Not on our price list yet

Possession 30 Sep 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 109, Gurugram0.8 km from Dwarka Expressway, in a straight line
Registered by
ISHV REALTORS PRIVATE LIMITEDthe company that filed it, for Ishv Realtors
Timeline
  1. 23 Jan 2014Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2027Possession, as declareddeclared to HARERA, read 29 Oct 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside15,049 m² in all, by use
  • Apartment buildings5,485 m² · 36%
  • Roads3,645 m² · 24%
  • Other uses3,014 m² · 20%
  • Parking2,705 m² · 18%
  • Electricity sub-station200 m² · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningAs per DBR in selected spaces.
  • Lifts12-18 persons approx. each lift capacity
  • FloorsStone / tiles in common areas
  • WallsCement/ plaster
  • BathroomsChinaware with CP fittings
  • WindowsUPVC frame / aluminium frame with glass
  • Main doorGlass doors

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 109, GurugramSector 109, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Dwarka ExpresswayOpen, 17 Aug 20250.8 km
  • Delhi–Gurugram–SNB RRTS5.3 km
  • Sohna Elevated Corridor (NH-248A)7.8 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 1 project in Bhumiq’s records, by what HARERA’s record shows
  • Registered, no OC or CC yet: 1

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.

Questions buyers ask

Is PLATINA STREET 109 registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/693/425/2023/37. Valid to 30 Sep 2027.

The source ↗
What is the possession timeline for PLATINA STREET 109?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2027. Its registration runs to 30 Sep 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around PLATINA STREET 109?From the records · Map pin and road lines, read 6 Sep 2026

PLATINA STREET 109 is in Sector 109, Gurugram; the site address declared to HARERA is Sector 109, Village Pawal Khusurpur, Dwarka Expressway, Gurgaon. In a straight line it is about 0.8 km from Dwarka Expressway, 5.3 km from Delhi–Gurugram–SNB RRTS and 7.8 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building PLATINA STREET 109?From the records · HARERA, read 3 Nov 2026

PLATINA STREET 109 is a Ishv Realtors project, registered by its company ISHV REALTORS PRIVATE LIMITED.

The source ↗Ishv Realtors's projects and court record

The records

What the registers hold for PLATINA STREET 109: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/693/425/2023/37: Registered. Valid to 30 Sep 2027.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 24 OF 2011 is on the DTCP register: Licence lapsed; the register prints its validity to 23 Mar 2025.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 23 Jan 2014, building plans 23 Jan 2014.Declared to HARERA, read 29 Oct 2026
The court record of Ishv Realtors’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 24 OF 2011 lapsed

    Named in this project’s application. Valid to 23 Mar 2025; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 43 HARERA files, with the dates we read them
Registration no.
GGM/693/425/2023/37
Registration valid till
30 Sept 2027
Declared possession
30 Sept 2027

Declared by the promoter to HARERA

Land area
3.7187 (Acre) (15,049.04 sq m)
FAR
1.74 proposed of 1.75 permissible
licence
24 of 2011 dated 24.03.2011
Estimated project cost
₹231.37 crore
Cost of land
₹13.91 crore
Layout plan, declared approved (field 5a)
23 Jan 2014
Building plans, declared approved
23 Jan 2014
Construction to start
1 Oct 2022
Completion declared for
30 Sept 2027
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 515 units · 1 tower
Statutory approvals, as declared · 3

Statutory approvals, as declared

  • I. LICENSE — declared: already been obtained (24 Mar 2011)
  • II. ZONING PLAN — declared: already been obtained (1 Apr 2013)
  • III. BR-III — declared: already been obtained (23 Jan 2014)
On file with HARERA · 43 files

On file with HARERA (43)

Plans

Site plan

2 files
Site plan19 Nov 2024Approved Site Plan14 Jul 2023

Layout plan

1 file
Latest Layout Plan14 Jul 2023

Zoning plan

1 file
Zoning Plan14 Jul 2023

Demarcation plan

2 files
Demarcation Plan14 Jul 2023Superimposed Demarcation14 Jul 2023

Building plans

9 files
Section plan19 Nov 2024Elevation-219 Nov 2024Elevation19 Nov 2024

Floor plans

11 files
Basement 1 & 2nd floor plan19 Nov 20243rd & 4th floor plan19 Nov 20241st & 2nd floor plan19 Nov 2024

Services

Sewerage and drainage

2 files
Storm Water Layout Plan14 Jul 2023Sewage Plan14 Jul 2023

Water supply

1 file
Water Supply Plan14 Jul 2023

Roads

1 file
Road Layout Plan14 Jul 2023

Landscape and green areas

1 file
Landscape Plan14 Jul 2023

Approvals and clearances

DTCP licence

2 files
Final COD (Change of Developer)14 Jul 2023Licence Copy with Land Schedule20 Aug 2022

Environment clearance

1 file
Environment Clearance NOC (29-1-22)14 Jul 2023

Other NOCs and clearances

1 file
Airport NOC (AAI)14 Jul 2023

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration14 Jul 2023

Money

Accounts and finance

3 files
Cash Flow Statement14 Jul 2023CA Certificate on the Application’s Figures14 Jul 2023Non-Default Certificate from a CA14 Jul 2023

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit14 Jul 2023

HARERA’s orders

HARERA’s orders

1 file
Addendum to Registration Certificate after change in FAR area of the project pursuant to the revision in building plans19 Nov 2024

Other filings

Other filings

2 files
Lower ground & UGF plan19 Nov 2024Upper Gf Plan14 Jul 2023

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

24 OF 2011 · Anjuman & Estates · GURGAON-MANESAR

Licence valid to 23 Mar 2025

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 29 Sept 2022 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

24 OF 2011: 7 parcels, 3.7187 acres in all, in Parwala khusrupur (hadbast 54), tehsil Kadipur.

The licence register prints the same licensed area, 3.72 acres.

  • 11//24/17 kanal 16 marla
  • 11//24/22 marla
  • 11//24/32 marla
  • 11//25/13 kanal 16 marla
Show the other 3 parcels
  • 11//25/23 kanal 16 marla
  • 17//57 kanal 12 marla
  • 17//6/16 kanal 11 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Parwala khusrupur (hadbast 54), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 11//24/1.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site plan19 Nov 2024Approved Site Plan14 Jul 2023

Layout plan

1 file
Latest Layout Plan14 Jul 2023

Building plans

9 files
Section plan19 Nov 2024Elevation-219 Nov 2024Elevation19 Nov 20245 to 7th terrace floor plan19 Nov 2024Elevation Front and Right Side14 Jul 2023BR III14 Jul 2023

Floor plans

11 files
Basement 1 & 2nd floor plan19 Nov 20243rd & 4th floor plan19 Nov 20241st & 2nd floor plan19 Nov 20241st Basement Plan14 Jul 20231st Floor Plan14 Jul 2023Dimension Plan for Upper Ground Floor14 Jul 2023

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (43 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/2071 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Ishv Realtors

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.