Riddhi Siddhi
by Pivotal Infrastructure · Sector 99, Gurugram
Not on our price list yet
Possession 27 May 2021 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 99, Gurugram0.5 km from Dwarka Expressway, in a straight linePrices and what changed
- Registered by
- M/S PIVOTAL INFRASTRUCTURE PVT. LTD.the company that filed it, for Pivotal Infrastructure
- 17 Oct 2014Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
- 19 Sep 2017Registered with HARERAHARERA, read 4 Nov 2026
- 31 Aug 2020Registration valid toHARERA, read 4 Nov 2026
- 27 May 2021Possession, as declareddeclared to HARERA, read 29 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- Under 1,000 sq ft350–487 sq ft992
Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- KitchenTiles
- LiftsAs per NBCC CODE
- FloorsTiles
- WallsOil bound distemper
- BathroomsISI MARK
- WindowsPower coated/anodized UPVC frame windows
- Main doorPainted hardwood with moulded flush doors
- Electrical fittingsUSE of ISI marked products for wiring, switches and circuits
The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Dwarka ExpresswayOpen, 17 Aug 20250.5 km
- Delhi–Gurugram–SNB RRTS5.6 km
- Sohna Elevated Corridor (NH-248A)7.3 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- Other register states: 4
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Raheja Developers | Same sector | — | — | 27 Aug 2022 |
Assotech BlithNo photo on file yet | Assotech Moonshine Urban Developers | Same sector | — | — | — |
Project Phase-1No photo on file yet | Satya Townships | Same sector | — | — | — |
SOVEREIGN PARK (PHASE-II)No photo on file yet | Vatika Sovereign Park | Same sector | — | — | — |
No photo of the project on file yet | Raheja Developers | Same sector | — | — | 27 Aug 2022 |
| Pareena Infrastructures | Same sector | — | — | 30 Jun 2022 | |
HabitatNo photo on file yet | Prime Infradevelopers | Same sector | — | — | 30 Nov 2019 |
Cosmos Express 99/Cascade GardensNo photo on file yet | Shvinandan Buildtech | Same sector | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it.
Questions buyers ask
Is Riddhi Siddhi registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as 236 OF 2017, registered on 19 Sep 2017. The register’s record shows an end date of 31 Aug 2020. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for Riddhi Siddhi?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 27 May 2021. Its registration runs to 31 Aug 2020; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Riddhi Siddhi?From the records · Map pin and road lines, read 6 Sep 2026
Riddhi Siddhi is in Sector 99, Gurugram; the site address declared to HARERA is Village Khedki Majra Dhankot , Sector 99, Gurugram. In a straight line it is about 0.5 km from Dwarka Expressway, 5.6 km from Delhi–Gurugram–SNB RRTS and 7.3 km from Sohna Elevated Corridor (NH-248A).
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Riddhi Siddhi?From the records · HARERA, read 4 Nov 2026
Riddhi Siddhi is a Pivotal Infrastructure project, registered by its company M/S PIVOTAL INFRASTRUCTURE PVT. LTD..
The source ↗Pivotal Infrastructure's projects and court recordThe records
What the registers hold for Riddhi Siddhi: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration 236 OF 2017: Registration lapsed. The register’s record shows an end date of 31 Aug 2020.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 86 OF 2014 is on the DTCP register, valid to 31 Mar 2029.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 17 Oct 2014, building plans 17 Oct 2014.Declared to HARERA, read 29 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Registration lapsed
The register’s record shows an end date of 31 Aug 2020. HARERA Gurugram, read 4 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 9 HARERA files, with the dates we read them
- Registration no.
- 236 OF 2017
- Registration date
- 19 Sept 2017
- Registration valid till
- 31 Aug 2020
- Declared possession
- 27 May 2021
Declared by the promoter to HARERA
- Land area
- 6.02990 (Acre) (24,402.14 sq m)
- FAR
- the application prints 225, which is not a ratio
- licence
- 86 of 2014(09.08.2014)
- Estimated project cost
- ₹201.60 crore
- Cost of land
- ₹36.93 crore
- Layout plan, declared approved (field 5a)
- 17 Oct 2014
- Building plans, declared approved
- 17 Oct 2014
- Completion declared for
- 27 May 2021
Declared inventory · 4 types
Declared inventory
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK-A · 384 units · 45.243 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 2BHK-B · 384 units · 45.163 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 1BHK-A · 112 units · 32.834 sq m carpet · one flat
- APARTMENT/SHOPS/OTHER BUILDINGS Type 1BHK-B · 112 units · 32.558 sq m carpet · one flat
Statutory approvals, as declared · 11
Statutory approvals, as declared
- I. HSVP CONSTRUCTION WATER NOC — declared: already been obtained (17 Oct 2014)
- II. POLLUTION — declared: already been obtained (16 Mar 2016)
- III. WATER NOC — declared: already been obtained (2 Dec 2015)
- IV. FOREST NOC — declared: already been obtained (16 Sept 2014)
- V. POWER LOAD ASSURANCE — declared: already been obtained (1 Oct 2014)
- VI. AAI — declared: already been obtained (11 Sept 2014)
- VII. FIRE SCHEME APPROVAL — declared: already been obtained (18 Jun 2015)
- VIII. BUILDING PLAN APPROVAL — declared: already been obtained (17 Oct 2014)
- IX. ENVIRONMENT CLEARANCE — declared: already been obtained (22 Jan 2016)
- X. SEWAGE CONNECTION — declared: already been obtained (9 Feb 2015)
- XI. SERVICE PLANS AND ESTIMATES — declared: yet to file for approval
On file with HARERA · 9 files
On file with HARERA (9)
Plans
Site plan
1 fileLayout plan
1 fileApprovals and clearances
DTCP licence
1 fileSales papers
Allotment and sale agreements
1 fileMoney
Accounts and finance
2 filesThe promoter’s papers
Declarations and affidavits
1 fileHARERA’s orders
HARERA’s orders
1 fileOther filings
Other filings
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
86 OF 2014 · Pivotal Infrastructure Pvt. Ltd. · GURGAON-MANESAR
Licence valid to 31 Mar 2029
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 30 Nov 2019 · read 29 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
86 OF 2014: 9 parcels, 6.1937 acres in all, in Kherki mazar dhankot (hadbast 52), tehsil Kadipur.
The licence register prints the same licensed area, 6.19 acres.
- 69//10/16 kanal 2 marla
- 69//128 kanal
- 69//13/12 kanal
- 69//13/25 kanal 13 marla
Show the other 5 parcels
- 69//14/12 kanal 18 marla
- 69//188 kanal
- 69//19/12 kanal
- 69//238 kanal
- 69//96 kanal 18 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Kherki mazar dhankot (hadbast 52), tehsil Kadipur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 69//10/1.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,000 per sq ft
Sector 99, collector rates effective 1 Apr 2026, Kadipur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Lenders that list this project
PNB Housing Finance’s approved-projects list carries “Riddhi Siddhi”, by M/s Pivotal Infrastructure Pvt Ltd, code NCR-2015-563, approved 2015.
PNB Housing Finance’s own page · read 26 Oct 2026 · www.pnbhousing.com ↗
A lender’s list prints no HARERA registration or licence number, so the Bhumiq team matched it to this project by its name and builder. A listing is the lender’s record of a project it has approved for home loans, not a loan offer.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileAmong the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (9 in all), none is a building plan, a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/1014 · read 29 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Pivotal Infrastructure
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.