Possession 30 Sep 2032 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 86, Gurugram2.7 km from Delhi–Gurugram–SNB RRTS, in a straight line
Carpet area
1,217–1,576 sq ft
In m²about 113–146 m², as declared
Registered by
EMAAR INDIA LIMITEDthe company that filed it, for Emaar India
Timeline
  1. 25 Sep 2025Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 30 Sep 2032Possession, as declareddeclared to HARERA, read 29 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

416homes, 1,217 to 1,576 sq ft of carpet area
  • 1,000–1,500 sq ft1,217–1,219 sq ft210
  • 1,500–2,000 sq ft1,576 sq ft206

Carpet area per home, as declared to HARERA (read 29 Oct 2026), in sq ft.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside7.214 acres in all, by use
  • Parks and playgrounds5.6 acres · 78%
  • Roads0.96 acres · 13%
  • Apartment buildings0.581 acres · 8%
  • Other usesas the form names them: Area under boundary wall, Area under tower drop offs0.073 acres · 1%

The land-use table of the HARERA application, declared to HARERA, read 29 Oct 2026. The share is of the land the table itemises.

In each home
  • Air-conditioningVRF with high wall units in bedroom, living, dining, kitchen
  • KitchenModular kitchen with chimney, HOBB,SS, sink, geyser
  • WardrobesE
  • FloorsStone / laminated wooden flooring/vitrified antiskid tiles
  • WallsAcrylic emulsion paint
  • BathroomsWASH basin, WC, mirror, shower partition

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 86, GurugramSector 86, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS2.7 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.2 km
  • Sohna Elevated Corridor (NH-248A)9.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 21 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 5
  • Registered, no OC or CC yet: 14
  • Other register states: 2

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is SERENITY HILLS (PHASE-2) registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/994/726/2025/97. Valid to 30 Sep 2032.

The source ↗
What is the possession timeline for SERENITY HILLS (PHASE-2)?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 30 Sep 2032. Its registration runs to 30 Sep 2032; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SERENITY HILLS (PHASE-2)?From the records · Map pin and road lines, read 6 Sep 2026

SERENITY HILLS (PHASE-2) is in Sector 86, Gurugram; the site address declared to HARERA is Sector 86, Gurugram, Haryana. In a straight line it is about 2.7 km from Delhi–Gurugram–SNB RRTS, 3.2 km from Dwarka Expressway and 9.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SERENITY HILLS (PHASE-2)?From the records · HARERA, read 4 Nov 2026

SERENITY HILLS (PHASE-2) is a Emaar India project, registered by its company EMAAR INDIA LIMITED.

The source ↗Emaar India's projects and court record

The records

What the registers hold for SERENITY HILLS (PHASE-2): registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/994/726/2025/97: Registered. Valid to 30 Sep 2032.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 10 OF 2025 is on the DTCP register, valid to 15 Jan 2030.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 25 Sep 2025, building plans 25 Sep 2025.Declared to HARERA, read 29 Oct 2026
The court record of Emaar India’s companies is on the developer’s page →

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 62 HARERA files, with the dates we read them
Registration no.
GGM/994/726/2025/97
Registration valid till
30 Sept 2032
Declared possession
30 Sept 2032

Declared by the promoter to HARERA

Land area
7.213 (Acre) (29,189.98 sq m)
FAR
1.41 proposed of 1.41 permissible
licence
License No. 10 of 2025 dated 16.01.2025 validity up to 15.01.2030 and License No. 75 of 2025 dated 22.05.2025 validity upto 21.05.2030
Estimated project cost
₹1580.22 crore
Cost of land
₹759.58 crore
Layout plan, declared approved (field 5a)
25 Sept 2025
Building plans, declared approved
25 Sept 2025
Construction to start
16 Oct 2025
Completion declared for
30 Sept 2032
Declared inventory · 12 types

Declared inventory — 12 types declared, first 8 shown

  • Apartment/Shops/Other Buildings · 36 units · 146.39 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 34 units · 146.46 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 113.18 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 65 units · 113.26 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 4 units · 113.09 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 12 units · 113.18 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 56 units · 113.18 sq m carpet · 3 towers · one flat
  • Apartment/Shops/Other Buildings · 66 units · 146.46 sq m carpet · 3 towers · one flat
Statutory approvals, as declared · 8

Statutory approvals, as declared

  • I. LICENSE NO. 75 OF 2025 — declared: already been obtained (22 May 2025)
  • II. LICENSE NO. 10 OF 2025 — declared: already been obtained (16 Jan 2025)
  • III. APPROVAL OF ZONING PLAN — declared: already been obtained (6 Aug 2025)
  • IV. APPROVAL OF BUILDING PLAN BRIII — declared: already been obtained (25 Sept 2025)
  • V. ASSURANCE OF SEWERAGE CONNECTION — declared: already been obtained (8 Sept 2025)
  • VI. ASSURANCE OF STORM CONNECTION — declared: already been obtained (5 Sept 2025)
  • VII. NO OBJECTION CERTIFICATE FOR HEIGHT CLEARANCE — declared: already been obtained (4 Aug 2025)
  • VIII. ASSURANCE OF WATER SUPPLY — declared: already been obtained (8 Sept 2025)
On file with HARERA · 62 files

On file with HARERA (62)

Plans

Site plan

4 files
Site Plan Stilt Level Plan17 Nov 2025Site Plan with Green Area17 Nov 2025Approved Site Plan17 Nov 2025Site Plan with External Service17 Nov 2025

Layout plan

2 files
Phasing Plan17 Nov 2025Latest Layout Plan25 Sept 2025

Zoning plan

1 file
Zoning Plan17 Nov 2025

Demarcation plan

1 file
Demarcation Plan18 Sept 2025

Building plans

9 files
Tower B1 Elevation A&B17 Nov 2025Tower B1 35 Terrace Level17 Nov 2025Tower B3 Elevation17 Nov 2025

Floor plans

18 files
Tower B3 34 and 3517 Nov 2025Basement 1 Area Detail and Area Diagram17 Nov 2025Tower B2 Secton 117 Nov 2025

Services

Sewerage and drainage

2 files
Assurance for Storm Water Connection17 Nov 2025Assurance for Sewerage Connection17 Nov 2025

Water supply

1 file
Assurance for Water Supply17 Nov 2025

Service plans

1 file
Service Plans on the Layout18 Sept 2025

Approvals and clearances

DTCP licence

3 files
Licence Copy with Land Schedule17 Nov 2025COD Order17 Nov 2025LOI17 Nov 2025

Other NOCs and clearances

3 files
Height Clearance17 Nov 2025Construction Water NOC17 Nov 2025Forest NOC17 Nov 2025

Land records

Land records

7 files
Mutation17 Nov 2025Revenue Record Entry of Licence and Collaboration17 Nov 2025Jamabandi17 Nov 2025

Sales papers

Allotment and sale agreements

1 file
BBA Draft19 Nov 2025

Money

Accounts and finance

5 files
CA Certificate on the Application’s Figures17 Nov 2025CA Certificate for Cost Incurred17 Nov 2025Non-Default Certificate from a CA17 Nov 2025

The promoter’s papers

Declarations and affidavits

3 files
Bank Undertaking17 Nov 2025List of Pending Litigations Serenity Ph 217 Nov 2025The Promoter’s Declaration on Affidavit18 Sept 2025

HARERA’s orders

HARERA’s orders

1 file
Corrigendum for Correction in Name Amardeep Buildcon and Gateau Sector-86, Gurugram17 Nov 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The 2 DTCP licences named on the application

10 OF 2025 · Emaar India Ltd. · GURGAON-MANESAR

Licence valid to 15 Jan 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

75 OF 2025 · Emaar India Ltd. · GURGAON-MANESAR

Licence valid to 21 May 2030

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 25 Sept 2025 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the 2 licences

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

10 OF 2025: 51 parcels, 24.4375 acres in all, in Lakhnola (hadbast 110) and Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 24.4375 acres.

  • 1//152 kanal 16 marlaLakhnola (110)
  • 1//16/16 kanal 14 marlaLakhnola (110)
  • 1//25/21 kanal 12 marlaLakhnola (110)
  • 2//1915 marlaLakhnola (110)
Show the other 47 parcels
  • 2//205 kanal 4 marlaLakhnola (110)
  • 2//218 kanalLakhnola (110)
  • 2//227 kanal 10 marlaLakhnola (110)
  • 2//23/11 kanal 10 marlaLakhnola (110)
  • 4//1/16 kanal 9 marlaLakhnola (110)
  • 4//2/22 kanalLakhnola (110)
  • 4//3/12 kanal 12 marlaLakhnola (110)
  • 5//6/15 kanalLakhnola (110)
  • 5//6/21 kanal 9 marlaLakhnola (110)
  • 5//6/31 kanal 7 marlaLakhnola (110)
  • 5//7/25 kanal 11 marlaLakhnola (110)
  • 41//107 kanal 7 marlaBadha (113)
  • 41//11/14 kanalBadha (113)
  • 41//11/24 kanalBadha (113)
  • 41//12/13 kanal 13 marlaBadha (113)
  • 41//12/2/115 marlaBadha (113)
  • 41//9/2/22 kanal 14 marlaBadha (113)
  • 42//14/2/12 kanalBadha (113)
  • 42//15/116 marlaBadha (113)
  • 42//15/27 kanal 4 marlaBadha (113)
  • 42//6/1/21 kanal 7 marlaBadha (113)
  • 42//6/26 kanal 4 marlaBadha (113)
  • 42//7/1/34 marlaBadha (113)
  • 44//35 kanalBadha (113)
  • 41//12/2/22 kanal 18 marlaBadha (113)
  • 41//13/16 kanal 5 marlaBadha (113)
  • 41//13/21 kanal 2 marlaBadha (113)
  • 41//198 kanalBadha (113)
  • 41//20/11 kanal 11 marlaBadha (113)
  • 41//20/27 kanal 16 marlaBadha (113)
  • 41//226 kanalBadha (113)
  • 41//8/2/210 marlaBadha (113)
  • 41//9/2/12 kanal 1 marlaBadha (113)
  • 42//14/2/29 marlaBadha (113)
  • 42//16/11 kanal 8 marlaBadha (113)
  • 42//16/23 kanal 5 marlaBadha (113)
  • 1//12/13 marlaLakhnola (110)
  • 1//13/16 kanal 10 marlaLakhnola (110)
  • 1//147 kanal 12 marlaLakhnola (110)
  • 1//16/21 kanal 4 marlaLakhnola (110)
  • 1//178 kanalLakhnola (110)
  • 1//717 marlaLakhnola (110)
  • 1//81 kanal 10 marlaLakhnola (110)
  • 1//23/22 kanal 8 marlaLakhnola (110)
  • 1//248 kanalLakhnola (110)
  • 1//25/16 kanal 8 marlaLakhnola (110)
  • 5//58 kanalLakhnola (110)

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

75 OF 2025

DTCP’s page showed no land schedule for licence 75 OF 2025 when Bhumiq read it on 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village you want: Lakhnola (hadbast 110) or Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 1//15.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate

No one collector rate can be matched to this project's type.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

4 files
Site Plan Stilt Level Plan17 Nov 2025Site Plan with Green Area17 Nov 2025Approved Site Plan17 Nov 2025Site Plan with External Service17 Nov 2025

Layout plan

2 files
Phasing Plan17 Nov 2025Latest Layout Plan25 Sept 2025

Building plans

9 files
Tower B1 Elevation A&B17 Nov 2025Tower B1 35 Terrace Level17 Nov 2025Tower B3 Elevation17 Nov 2025Tower B3 36 Terrace Level17 Nov 2025Tower B2 Elevation17 Nov 2025Building Plan Approval Letter BR III17 Nov 2025

Floor plans

18 files
Tower B3 34 and 3517 Nov 2025Basement 1 Area Detail and Area Diagram17 Nov 2025Tower B2 Secton 117 Nov 2025Tower C1 Stilt Ground17 Nov 2025Tower B3 Typical17 Nov 2025Tower C1 Typical17 Nov 2025

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (62 in all), none is a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/3690 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Emaar India

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.