SS High Point

by SS Group · Sector 86, Gurugram

Not on our price list yet

Possession 31 Dec 2023 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 86, Gurugram2.7 km from Delhi–Gurugram–SNB RRTS, in a straight linePrices and what changed
Carpet area
about 1,023 sq ft
In m²about 95 m², the average flat, as declared
Registered
5 Jul 2019
Registered by
SS GROUP PVT. LTD.the company that filed it, for SS Group
Timeline
  1. 17 May 2019Layout and building plans approveddeclared to HARERA, read 29 Oct 2026
  2. 5 Jul 2019Registered with HARERAHARERA, read 4 Nov 2026
  3. 31 Dec 2023Possession, as declareddeclared to HARERA, read 29 Oct 2026
  4. 29 Jun 2025Registration valid toHARERA, read 4 Nov 2026

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

In each home
  • Air-conditioningCentralized chiller
  • Lifts7 no. of lifts 2 no. of service elevators 2 no. of escalators
  • Floors1. concrete flooring in SHOP/tenant area 2. glazed stone in lobbies/corridors 3. tiles in common toilets
  • WallsCement plastered with OBD paint in SHOP/tenant area
  • BathroomsStandard fitting & fixtures in common toilet
  • WindowsUPVC/ALU/plain glass
  • Water storageUnderground & overhead tank for common areas

The developer’s specifications in the HARERA application, declared to HARERA, read 29 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 86, GurugramSector 86, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Delhi–Gurugram–SNB RRTS2.7 km
  • Dwarka ExpresswayOpen, 17 Aug 20253.2 km
  • Sohna Elevated Corridor (NH-248A)9.9 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 14 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 5
  • Registered, no OC or CC yet: 5
  • Other register states: 4

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is SS High Point registered with HARERA?From the records · HARERA, read 4 Nov 2026

HARERA lists it as GGM/342/74/2019/36, registered on 5 Jul 2019. The register’s record shows an end date of 29 Jun 2025. The register shows it as: Registration lapsed.

The source ↗
What is the possession timeline for SS High Point?From the records · HARERA, read 4 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2023. Its registration runs to 29 Jun 2025; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around SS High Point?From the records · Map pin and road lines, read 6 Sep 2026

SS High Point is in Sector 86, Gurugram; the site address declared to HARERA is Sector-86, Gurugram. In a straight line it is about 2.7 km from Delhi–Gurugram–SNB RRTS, 3.2 km from Dwarka Expressway and 9.9 km from Sohna Elevated Corridor (NH-248A).

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building SS High Point?From the records · HARERA, read 4 Nov 2026

SS High Point is a SS Group project, registered by its company SS GROUP PVT. LTD..

The source ↗SS Group's projects and court record

The records

What the registers hold for SS High Point: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/342/74/2019/36: Registration lapsed. The register’s record shows an end date of 29 Jun 2025.HARERA, read 4 Nov 2026 · See it on HARERA ↗
  • Land licence 4 OF 2019 is on the DTCP register: Licence lapsed; the register prints its validity to 16 Jan 2024.DTCP, read 3 Nov 2026
  • Plans approved, as the developer declared: layout plan 17 May 2019, building plans 17 May 2019.Declared to HARERA, read 29 Oct 2026
The court record of SS Group’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Red flag: Licence 4 OF 2019 lapsed

    Named in this project’s application. Valid to 16 Jan 2024; no renewal on record. DTCP Haryana register, read 3 Nov 2026. Source

  • Amber flag: Registration lapsed

    The register’s record shows an end date of 29 Jun 2025. HARERA Gurugram, read 4 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 13 HARERA files, with the dates we read them
Registration no.
GGM/342/74/2019/36
Registration date
5 Jul 2019
Registration valid till
29 Jun 2025
Declared possession
31 Dec 2023

Declared by the promoter to HARERA

Land area
2.80625 (Acre) (11,356.49 sq m)
FAR
2.43 proposed of 2.5 permissible
licence
04 OF 2019 (17-01-2019)
Estimated project cost
₹182.04 crore
Cost of land
₹8.02 crore
Layout plan, declared approved (field 5a)
17 May 2019
Building plans, declared approved
17 May 2019
Construction to start
1 Oct 2019
Completion declared for
31 Dec 2023
Declared inventory · 1 type

Declared inventory

  • Apartment/Shops/Other Buildings · 207 units · 19,673 sq m carpet · 1 tower · total for 207 flats, about 95 m² each
Statutory approvals, as declared · 4

Statutory approvals, as declared

  • I. LICENSE APPROVAL — declared: already been obtained (17 Jan 2019)
  • II. ZONING PLAN — declared: already been obtained (17 Jan 2019)
  • III. BUILDING PLAN — declared: already been obtained (17 May 2019)
  • IV. ENVIRONMENT CLEARANCE — declared: applied for but yet to receive (29 Apr 2019)
On file with HARERA · 13 files

On file with HARERA (13)

Plans

Site plan

1 file
Approved Site Plan20 May 2019

Layout plan

1 file
Latest Layout Plan20 May 2019

Zoning plan

1 file
Zoning Plan20 May 2019

Demarcation plan

1 file
Demarcation Plan14 Jun 2019

Building plans

1 file
Approved Building Plans, Full Set20 May 2019

Services

Service plans

1 file
Service Plans on the Layout20 May 2019

Approvals and clearances

DTCP licence

1 file
Licence Copy with Land Schedule20 May 2019

Land records

Land records

1 file
Revenue Record Entry of Licence and Collaboration20 May 2019

Money

Accounts and finance

3 files
Cash Flow Statement20 May 2019Non-Default Certificate from a CA20 May 2019CA Certificate on the Application’s Figures20 May 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit20 May 2019

HARERA’s orders

HARERA’s orders

1 file
Extension No. 05 of 2025 dated 31.01.20254 Apr 2025

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

4 OF 2019 · SS Group Pvt. Ltd. · GURGAON-MANESAR

Licence valid to 16 Jan 2024

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 20 May 2019 · read 29 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

4 OF 2019: 5 parcels, 2.8062 acres in all, in Badha (hadbast 113), tehsil Manesar.

The licence register prints the same licensed area, 2.8063 acres.

  • 31//19/2/210 marla
  • 31//20/1/25 kanal 10 marla
  • 31//218 kanal
  • 37//5/2/24 kanal 13 marla
Show the other 1 parcel
  • 38//1min3 kanal 16 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 23 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badha (hadbast 113), tehsil Manesar. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 31//19/2/2.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, commercial property
₹2,02,800 per sq yd

Sector 86, collector rates effective 1 Apr 2026, Manesar tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a property is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

1 file
Approved Site Plan20 May 2019

Layout plan

1 file
Latest Layout Plan20 May 2019

Building plans

1 file
Approved Building Plans, Full Set20 May 2019

Among the uploads Bhumiq read from HARERA's page on 29 Oct 2026 (13 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/645 · read 29 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on SS Group

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.