Skip to content

Tulip Yellow

by Tulip Infratech · Sector 69, Gurugram

Not on our price list yet

Possession 31 Dec 2027 · as the developer declared it to HARERA

About this project

Key facts

Location
Sector 69, Gurugram0.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
Carpet area
1,034–2,130 sq ft
In m²about 96–198 m², as declared
Registered
14 Nov 2019
Registered by
TULIP INFRATECH PVT. LTD.the company that filed it, for Tulip Infratech
Timeline
  1. 14 Nov 2019Registered with HARERAHARERA, read 3 Nov 2026
  2. 31 Dec 2027Possession, as declareddeclared to HARERA, read 15 Oct 2026

Homes on offer

The homes the developer declared to HARERA, by size.

632homes, 1,034 to 2,130 sq ft of carpet area
  • 1,000–1,500 sq ft1,034 sq ft624
  • 1,500–2,000 sq ft1,832 sq ft6
  • 2,000–2,500 sq ft2,130 sq ft2

Carpet area per home, as declared to HARERA (read 15 Oct 2026), in sq ft. Left out: 112 units under 25 m², because the form lists homes, shops and other buildings in one table.

Amenities and specifications

How the land is set aside and what comes in each home, as the developer declared them to HARERA.

How the land is set aside30,183 m² in all, by use
  • Pavements8,404 m² · 28%
  • Roads6,370 m² · 21%
  • Parks and playgrounds3,820 m² · 13%
  • Apartment buildings3,519 m² · 12%
  • Green belts2,367 m² · 8%
  • Parking2,163 m² · 7%
  • Other uses2,128 m² · 7%
  • Club house748 m² · 2%
  • Land for community services, handed to the government464 m² · 2%
  • Electricity sub-station200 m² · under 1%

The land-use table of the HARERA application, declared to HARERA, read 15 Oct 2026. The share is of the land the table itemises.

In each home
  • KitchenMarble/granite counter with SS sink
  • Lifts3 NOS, capacity10 & 13 person, KONE or equivalent
  • FloorsAnti skid tiles ceramic tiles/ vitrified tiles
  • WallsOil bound distemper
  • BathroomsWhite sanitary, CP fitting and mirror
  • WindowsUPVC windows or equivalent
  • Main doorFlush door
  • Electrical fittingsSwitches only (no lights & fixtures)

The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.

Location and connectivity

Where it is and what is near it. Every distance is a straight line, not a travel time.

Sector 69, GurugramSector 69, Gurugram (placed by sector) · openstreetmap.orgOpen in Google Maps
Roads and rail lines
  • Sohna Elevated Corridor (NH-248A)0.8 km
  • Delhi–Gurugram–SNB RRTS4.6 km
  • Dwarka ExpresswayOpen, 17 Aug 20254.7 km

Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.

Map data © OpenStreetMap contributors.

The builder

Its 9 projects in Bhumiq’s records, by what HARERA’s record shows
  • OC or CC dispatched: 1
  • Registered, no OC or CC yet: 5
  • Other register states: 3

Other projects nearby

8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.

Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.

Questions buyers ask

Is Tulip Yellow registered with HARERA?From the records · HARERA, read 3 Nov 2026

HARERA lists it as GGM/376/108/2019/70, registered on 14 Nov 2019. Valid to 31 Dec 2027.

The source ↗
What is the possession timeline for Tulip Yellow?From the records · HARERA, read 3 Nov 2026

When it registered the project, the developer declared that it would hand over homes by 31 Dec 2027. Its registration runs to 31 Dec 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.

The source ↗
How is the connectivity around Tulip Yellow?From the records · Map pin and road lines, read 6 Sep 2026

Tulip Yellow is in Sector 69, Gurugram; the site address declared to HARERA is Sector 69, Village Badshahpur. In a straight line it is about 0.8 km from Sohna Elevated Corridor (NH-248A), 4.6 km from Delhi–Gurugram–SNB RRTS and 4.7 km from Dwarka Expressway.

The source ↗
What will I pay on top of the price?General guidance

You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.

Work out the stamp duty
Who is building Tulip Yellow?From the records · HARERA, read 3 Nov 2026

Tulip Yellow is a Tulip Infratech project, registered by its company TULIP INFRATECH PVT. LTD..

The source ↗Tulip Infratech's projects and court record

The records

What the registers hold for Tulip Yellow: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.

  • HARERA registration GGM/376/108/2019/70: Registered. Valid to 31 Dec 2027.HARERA, read 3 Nov 2026 · See it on HARERA ↗
  • Land licence 16 OF 2019 is on the DTCP register: Licence ends soon; the register prints its validity to 8 Feb 2027.DTCP, read 3 Nov 2026
The court record of Tulip Infratech’s companies is on the developer’s page →

Flagged on the record

These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.

  • Amber flag: Licence 16 OF 2019 ends soon

    Named in this project’s application. Valid to 8 Feb 2027. DTCP Haryana register, read 3 Nov 2026. Source

Not checked yet: the land owner records (jamabandi) and complaints at HARERA.

Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 16 HARERA files, with the dates we read them
Registration no.
GGM/376/108/2019/70
Registration date
14 Nov 2019
Registration valid till
31 Dec 2027
Declared possession
31 Dec 2027

Declared by the promoter to HARERA

Land area
7.4583 (Acre) (30,182.67 sq m)
FAR
the application prints 249.92, which is not a ratio
licence
16 of 2019 dated 09/02/2019
Estimated project cost
₹379.16 crore
Cost of land
₹15.64 crore
Construction to start
1 Oct 2019
Completion declared for
31 Dec 2027
Declared inventory · 4 types

Declared inventory

  • Apartment/Shops/Other Buildings · 624 units · 96.089 sq m carpet · 6 towers · one flat
  • Apartment/Shops/Other Buildings · 6 units · 170.183 sq m carpet · 6 towers · one flat
  • Apartment/Shops/Other Buildings · 2 units · 197.88 sq m carpet · 1 tower · one flat
  • Apartment/Shops/Other Buildings · 112 units · 18.788 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 5

Statutory approvals, as declared

  • I. SITE PLAN — declared: already been obtained (18 Apr 2019)
  • II. DEMARCATION PLAN — declared: already been obtained (1 Feb 2019)
  • III. ZONING PLAN — declared: already been obtained (9 Feb 2019)
  • IV. BUILDING PLAN — declared: already been obtained (18 Apr 2019)
  • V. ELEVATION SECTION — declared: already been obtained (18 Apr 2019)
On file with HARERA · 16 files

On file with HARERA (16)

Plans

Site plan

2 files
Site Plan22 Nov 2019Approved Site Plan31 Jul 2019

Layout plan

1 file
Latest Layout Plan31 Jul 2019

Zoning plan

1 file
Zoning Plan29 Jul 2019

Demarcation plan

1 file
Demarcation Plan30 Jul 2019

Building plans

1 file
Approved Building Plans, Full Set29 Jul 2019

Services

Service plans

2 files
Service Plan Estimate Sanctioned Letter from Dgtcp22 Nov 2019Service Plans on the Layout30 Jul 2019

Approvals and clearances

DTCP licence

2 files
BR III TOD-122 Nov 2019Licence Copy with Land Schedule29 Jul 2019

Land records

Land records

2 files
Collaboration Agreement22 Nov 2019Revenue Record Entry of Licence and Collaboration30 Jul 2019

Money

Accounts and finance

3 files
Non-Default Certificate from a CA31 Jul 2019CA Certificate on the Application’s Figures31 Jul 2019Cash Flow Statement29 Jul 2019

The promoter’s papers

Declarations and affidavits

1 file
The Promoter’s Declaration on Affidavit22 Nov 2019

These are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.

The DTCP licence named on the application

16 OF 2019 · Tulip Infratech Pvt. Ltd · GURGAON-MANESAR

Licence valid to 8 Feb 2027

From the Town & Country Planning department’s licence register, read 3 Nov 2026.

A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.

declared in the registration application (Form REP-I), Gurugram bench · submitted 31 Jul 2019 · read 15 Oct 2026 · not verified by Bhumiq

source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026

Land under the licence

The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.

16 OF 2019: 13 parcels, 7.4458 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.

The licence register prints the licensed area as 7.4583 acres.

  • 75//108 kanal
  • 75//9/31 kanal
  • 76//68 kanal
  • 76//78 kanal
Show the other 9 parcels
  • 76//88 kanal
  • 76//98 kanal
  • rectangle 76, kila 11/2 min1 kanal 17 marla 3 sarsai
  • rectangle 76, kila 12 min4 kanal 14 marla
  • rectangle 76, kila 13 min4 kanal 5 marla
  • rectangle 76, kila 5/2 min1 kanal 9 marla
  • rectangle 75, kila 1/1 min3 kanal 12 marla
  • rectangle 75, kila 1/2/1 min1 kanal 2 marla
  • 76//5/1/21 kanal 12 marla

The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.

From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source

Who owns this land today, or is it mortgaged?

The Bhumiq team checks it with you.

Check it yourself on jamabandi.nic.in
  1. Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
  2. Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
  3. Pick the latest year, then a from the list here, such as 75//10.
  4. Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.

Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.

Collector rate, residential flat
₹6,950 per sq ft

Sector 69, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source

Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.

Worked out on this page. Not saved or sent.

Layouts & payment plan

Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.

Site plan

2 files
Site Plan22 Nov 2019Approved Site Plan31 Jul 2019

Layout plan

1 file
Latest Layout Plan31 Jul 2019

Building plans

1 file
Approved Building Plans, Full Set29 Jul 2019

Among the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (16 in all), none is a floor plan or a payment plan.

source: https://haryanarera.gov.in/view_project/project_preview_open/777 · read 15 Oct 2026

Talk to the Bhumiq team about payment plans

The call is with the Bhumiq team. You need a free account so we can call you back.

Run due diligence on Tulip Infratech

Its court cases, its DTCP licences and the source of each fact, free once you sign in.

Open the developer profile

As of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.

Ask Bhumiq about this developer, project or sector.

Plain-language answers on HARERA filings, DTCP licences, occupation certificates and court records, with their government sources and the dates they were read.