About this project
Key facts
- Location
- Sector 69, Gurugram0.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
- Registered by
- TULIP INFRATECH PVT. LTD.the company that filed it, for Tulip Infratech
- 14 Nov 2019Registered with HARERAHARERA, read 3 Nov 2026
- 31 Dec 2027Possession, as declareddeclared to HARERA, read 15 Oct 2026
Homes on offer
The homes the developer declared to HARERA, by size.
- 1,000–1,500 sq ft1,034 sq ft624
- 1,500–2,000 sq ft1,832 sq ft6
- 2,000–2,500 sq ft2,130 sq ft2
Carpet area per home, as declared to HARERA (read 15 Oct 2026), in sq ft. Left out: 112 units under 25 m², because the form lists homes, shops and other buildings in one table.
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Pavements8,404 m² · 28%
- Roads6,370 m² · 21%
- Parks and playgrounds3,820 m² · 13%
- Apartment buildings3,519 m² · 12%
- Green belts2,367 m² · 8%
- Parking2,163 m² · 7%
- Other uses2,128 m² · 7%
- Club house748 m² · 2%
- Land for community services, handed to the government464 m² · 2%
- Electricity sub-station200 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 15 Oct 2026. The share is of the land the table itemises.
- KitchenMarble/granite counter with SS sink
- Lifts3 NOS, capacity10 & 13 person, KONE or equivalent
- FloorsAnti skid tiles ceramic tiles/ vitrified tiles
- WallsOil bound distemper
- BathroomsWhite sanitary, CP fitting and mirror
- WindowsUPVC windows or equivalent
- Main doorFlush door
- Electrical fittingsSwitches only (no lights & fixtures)
The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)0.8 km
- Delhi–Gurugram–SNB RRTS4.6 km
- Dwarka ExpresswayOpen, 17 Aug 20254.7 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 1
- Registered, no OC or CC yet: 5
- Other register states: 3
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 6 Feb 2019 |
No photo of the project on file yet | Ocean Seven Buildtech | Same sector | — | — | 13 Feb 2023 |
TRUMP RESIDENCES GURGAONNo photo on file yet | Riverday Infrastructure | Same sector | — | — | 30 Apr 2033 |
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 6 Feb 2019 |
![]() | Smartworld Developers | Same sector | Under construction | ₹20,000/sq ft | 31 May 2032 |
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 31 Aug 2019 |
| Pareena Infrastructures | 1.1 kmto its sector’s point | — | — | 11 Mar 2024 | |
Orion GalaxyNo photo on file yet | Soni Infratech | 1.1 kmto its sector’s point | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is Tulip Yellow registered with HARERA?From the records · HARERA, read 3 Nov 2026
HARERA lists it as GGM/376/108/2019/70, registered on 14 Nov 2019. Valid to 31 Dec 2027.
The source ↗What is the possession timeline for Tulip Yellow?From the records · HARERA, read 3 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Dec 2027. Its registration runs to 31 Dec 2027; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around Tulip Yellow?From the records · Map pin and road lines, read 6 Sep 2026
Tulip Yellow is in Sector 69, Gurugram; the site address declared to HARERA is Sector 69, Village Badshahpur. In a straight line it is about 0.8 km from Sohna Elevated Corridor (NH-248A), 4.6 km from Delhi–Gurugram–SNB RRTS and 4.7 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building Tulip Yellow?From the records · HARERA, read 3 Nov 2026
Tulip Yellow is a Tulip Infratech project, registered by its company TULIP INFRATECH PVT. LTD..
The source ↗Tulip Infratech's projects and court recordThe records
What the registers hold for Tulip Yellow: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/376/108/2019/70: Registered. Valid to 31 Dec 2027.HARERA, read 3 Nov 2026 · See it on HARERA ↗
- Land licence 16 OF 2019 is on the DTCP register: Licence ends soon; the register prints its validity to 8 Feb 2027.DTCP, read 3 Nov 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Licence 16 OF 2019 ends soon
Named in this project’s application. Valid to 8 Feb 2027. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 16 HARERA files, with the dates we read them
- Registration no.
- GGM/376/108/2019/70
- Registration date
- 14 Nov 2019
- Registration valid till
- 31 Dec 2027
- Declared possession
- 31 Dec 2027
Declared by the promoter to HARERA
- Land area
- 7.4583 (Acre) (30,182.67 sq m)
- FAR
- the application prints 249.92, which is not a ratio
- licence
- 16 of 2019 dated 09/02/2019
- Estimated project cost
- ₹379.16 crore
- Cost of land
- ₹15.64 crore
- Construction to start
- 1 Oct 2019
- Completion declared for
- 31 Dec 2027
Declared inventory · 4 types
Declared inventory
- Apartment/Shops/Other Buildings · 624 units · 96.089 sq m carpet · 6 towers · one flat
- Apartment/Shops/Other Buildings · 6 units · 170.183 sq m carpet · 6 towers · one flat
- Apartment/Shops/Other Buildings · 2 units · 197.88 sq m carpet · 1 tower · one flat
- Apartment/Shops/Other Buildings · 112 units · 18.788 sq m carpet · 1 tower · under 25 m²: a shop or service unit the form does not label
Statutory approvals, as declared · 5
Statutory approvals, as declared
- I. SITE PLAN — declared: already been obtained (18 Apr 2019)
- II. DEMARCATION PLAN — declared: already been obtained (1 Feb 2019)
- III. ZONING PLAN — declared: already been obtained (9 Feb 2019)
- IV. BUILDING PLAN — declared: already been obtained (18 Apr 2019)
- V. ELEVATION SECTION — declared: already been obtained (18 Apr 2019)
On file with HARERA · 16 files
On file with HARERA (16)
Plans
Site plan
2 filesLayout plan
1 fileZoning plan
1 fileDemarcation plan
1 fileBuilding plans
1 fileServices
Service plans
2 filesApprovals and clearances
DTCP licence
2 filesLand records
Land records
2 filesMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
16 OF 2019 · Tulip Infratech Pvt. Ltd · GURGAON-MANESAR
Licence valid to 8 Feb 2027
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 31 Jul 2019 · read 15 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 3 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
16 OF 2019: 13 parcels, 7.4458 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.
The licence register prints the licensed area as 7.4583 acres.
- 75//108 kanal
- 75//9/31 kanal
- 76//68 kanal
- 76//78 kanal
Show the other 9 parcels
- 76//88 kanal
- 76//98 kanal
- rectangle 76, kila 11/2 min1 kanal 17 marla 3 sarsai
- rectangle 76, kila 12 min4 kanal 14 marla
- rectangle 76, kila 13 min4 kanal 5 marla
- rectangle 76, kila 5/2 min1 kanal 9 marla
- rectangle 75, kila 1/1 min3 kanal 12 marla
- rectangle 75, kila 1/2/1 min1 kanal 2 marla
- 76//5/1/21 kanal 12 marla
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 75//10.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,950 per sq ft
Sector 69, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
2 filesLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (16 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/777 · read 15 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Tulip Infratech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.