TULIP PURPLE-PHASE 2
by Tulip Infratech · Sector 69, Gurugram
Not on our price list yet
Possession 31 Aug 2019 · as the developer declared it to HARERA
About this project
Key facts
- Location
- Sector 69, Gurugram0.8 km from Sohna Elevated Corridor (NH-248A), in a straight linePrices and what changed
- Registered by
- TULIP INFRATECH PVT. LTD.the company that filed it, for Tulip Infratech
- 15 Mar 2018Building plans approveddeclared to HARERA, read 15 Oct 2026
- 5 Apr 2018Layout plan approveddeclared to HARERA, read 15 Oct 2026
- 1 Apr 2019Registered with HARERAHARERA, read 4 Nov 2026
- 31 Aug 2019Possession, as declareddeclared to HARERA, read 15 Oct 2026
- 30 Dec 2023Registration valid toHARERA, read 4 Nov 2026
Amenities and specifications
How the land is set aside and what comes in each home, as the developer declared them to HARERA.
- Land for community services, handed to the government23,118 m² · 32%
- Parking15,325 m² · 21%
- Roads11,997 m² · 16%
- Parks and playgrounds11,055 m² · 15%
- Apartment buildings9,631 m² · 13%
- Other uses1,092 m² · 1%
- Electricity sub-station600 m² · under 1%
The land-use table of the HARERA application, declared to HARERA, read 15 Oct 2026. The share is of the land the table itemises.
- KitchenMarble/granite counter with SS sink
- Lifts2 NOS, capacity10 & 13 person, KONE or equivalent
- FloorsAnti skid tiles ceramic tiles/ vitrified tiles or equivalent
- WallsOil bound distemper
- BathroomsWhite sanitary, CP fitting and mirror
- WindowsUPVC windows or equivalent
- Main doorFlush door
- Electrical fittingsSwitches only (no lights & fixtures)
The developer’s specifications in the HARERA application, declared to HARERA, read 15 Oct 2026, in its words.
Location and connectivity
Where it is and what is near it. Every distance is a straight line, not a travel time.
- Sohna Elevated Corridor (NH-248A)0.8 km
- Delhi–Gurugram–SNB RRTS4.6 km
- Dwarka ExpresswayOpen, 17 Aug 20254.7 km
Distances run in a straight line from the map point to each line on OpenStreetMap (read 6 Sep 2026). A stage shows only where an authority’s page states one, dated by that page.
Map data © OpenStreetMap contributors.
The builder
- OC or CC dispatched: 2
- Registered, no OC or CC yet: 4
- Other register states: 3
Other projects nearby
8 of Bhumiq’s projects within 3 km of the map point, nearest first, in a straight line.
| Project | Builder | Distance | Stage | Asking rate | Possession |
|---|---|---|---|---|---|
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 6 Feb 2019 |
No photo of the project on file yet | Ocean Seven Buildtech | Same sector | — | — | 13 Feb 2023 |
TRUMP RESIDENCES GURGAONNo photo on file yet | Riverday Infrastructure | Same sector | — | — | 30 Apr 2033 |
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 6 Feb 2019 |
![]() | Smartworld Developers | Same sector | Under construction | ₹20,000/sq ft | 31 May 2032 |
No photo of the project on file yet | Tulip Infratech | Same sector | — | — | 31 Dec 2027 |
| Pareena Infrastructures | 1.1 kmto its sector’s point | — | — | 11 Mar 2024 | |
Orion GalaxyNo photo on file yet | Soni Infratech | 1.1 kmto its sector’s point | — | — | — |
Distances between the two map points, in a straight line; a project Bhumiq places only by its sector is measured to that sector’s point. Stage as Bhumiq’s team recorded it; possession as each developer declared it; asking rates from the Bhumiq team price list, 16 Sep 2026.
Questions buyers ask
Is TULIP PURPLE-PHASE 2 registered with HARERA?From the records · HARERA, read 4 Nov 2026
HARERA lists it as GGM/324/56/2019/18, registered on 1 Apr 2019. The register’s record shows an end date of 30 Dec 2023. The register shows it as: Registration lapsed.
The source ↗What is the possession timeline for TULIP PURPLE-PHASE 2?From the records · HARERA, read 4 Nov 2026
When it registered the project, the developer declared that it would hand over homes by 31 Aug 2019. Its registration runs to 30 Dec 2023; a developer that needs longer has to ask HARERA for an extension. This is the developer's own date, not a promise from HARERA.
The source ↗How is the connectivity around TULIP PURPLE-PHASE 2?From the records · Map pin and road lines, read 6 Sep 2026
TULIP PURPLE-PHASE 2 is in Sector 69, Gurugram; the site address declared to HARERA is Sector-69-70, Gurugram. In a straight line it is about 0.8 km from Sohna Elevated Corridor (NH-248A), 4.6 km from Delhi–Gurugram–SNB RRTS and 4.7 km from Dwarka Expressway.
The source ↗What will I pay on top of the price?General guidance
You pay stamp duty and a registration fee when the sale deed is registered. In Haryana the stamp duty rate depends on where the home is and whose name it is registered in. A home still being built also carries GST; a finished home sold after its completion certificate carries none. Developers may also charge for parking, club membership, preferential location (PLC) and a maintenance deposit. Ask for the full cost sheet in writing before you pay a token.
Work out the stamp dutyWho is building TULIP PURPLE-PHASE 2?From the records · HARERA, read 4 Nov 2026
TULIP PURPLE-PHASE 2 is a Tulip Infratech project, registered by its company TULIP INFRATECH PVT. LTD..
The source ↗Tulip Infratech's projects and court recordThe records
What the registers hold for TULIP PURPLE-PHASE 2: registration, licence, court, land, approvals and files, each with the register it comes from and the day Bhumiq read it.
- HARERA registration GGM/324/56/2019/18: Registration lapsed. The register’s record shows an end date of 30 Dec 2023.HARERA, read 4 Nov 2026 · See it on HARERA ↗
- Land licence 41 OF 2009 is on the DTCP register: Licence ended, LC-IX linked; the register prints its validity to 31 Jul 2024.DTCP, read 3 Nov 2026
- Plans approved, as the developer declared: layout plan 5 Apr 2018, building plans 15 Mar 2018.Declared to HARERA, read 15 Oct 2026
Flagged on the record
These are dates and statuses the registers print, as of the day Bhumiq read them. They are not a rating of the project.
Amber flag: Registration lapsed
The register’s record shows an end date of 30 Dec 2023. HARERA Gurugram, read 4 Nov 2026. Source
Amber flag: Licence 41 OF 2009 validity ended
Named in this project’s application. Valid to 31 Jul 2024. The register links a completion certificate (LC-IX), dated 12 Jul 2023, against this licence. DTCP Haryana register, read 3 Nov 2026. Source
Not checked yet: the land owner records (jamabandi) and complaints at HARERA.
Homes sold and leftFrom the developer's quarterly reports to HARERA
Registration, licence, land and approvals in fullFrom the registers, with 10 HARERA files, with the dates we read them
- Registration no.
- GGM/324/56/2019/18
- Registration date
- 1 Apr 2019
- Registration valid till
- 30 Dec 2023
- Declared possession
- 31 Aug 2019
Declared by the promoter to HARERA
- Land area
- 17.9936 (Acre) (72,817.52 sq m)
- FAR
- the application prints 174.95, which is not a ratio
- licence
- 41 of 2009
- Estimated project cost
- ₹48.03 crore
- Cost of land
- ₹0.99 crore
- Layout plan, declared approved (field 5a)
- 5 Apr 2018
- Building plans, declared approved
- 15 Mar 2018
- Completion declared for
- 31 Aug 2019
Statutory approvals, as declared · 7
Statutory approvals, as declared
- I. LICENSE — declared: already been obtained (27 Sept 2017)
- II. FOREST NOC — declared: already been obtained (13 Dec 2013)
- III. AIRPORT NOC — declared: already been obtained (15 Feb 2018)
- IV. HUDA CONSTRUCTION WATER NOC — declared: already been obtained (17 Oct 2012)
- V. ELECTRICAL LOAD AVAILABILITY — declared: already been obtained (12 Sept 2014)
- VI. ENVIRONMENT CLEARANCE — declared: already been obtained (11 Jun 2010)
- VII. CONSENT TO OPERATE — declared: already been obtained (10 Mar 2016)
On file with HARERA · 10 files
On file with HARERA (10)
Plans
Site plan
1 fileLayout plan
1 fileZoning plan
1 fileBuilding plans
1 fileServices
Service plans
1 fileApprovals and clearances
DTCP licence
1 fileMoney
Accounts and finance
3 filesThe promoter’s papers
Declarations and affidavits
1 fileThese are the copies HARERA holds. An approval belongs to the department that issued it, not to HARERA.
The DTCP licence named on the application
41 OF 2009 · Sh Roshan Lal, Smt Sushila Devi & others · GURGAON-MANESAR
Licence valid to 31 Jul 2024
From the Town & Country Planning department’s licence register, read 3 Nov 2026.
A licence is permission to develop the colony; the HARERA registration above is permission to sell, and the two lapse separately.
declared in the registration application (Form REP-I), Gurugram bench · submitted 12 Jan 2019 · read 15 Oct 2026 · not verified by Bhumiq
source: https://haryanarera.gov.in/admincontrol/registered_projects/2 · fetched 4 Nov 2026
Land under the licence
The land the licence was granted over, as the Town & Country Planning department’s land schedule lists it. It does not say who owns the land now.
41 OF 2009: 27 parcels, 17.9938 acres in all, in Badshapur (hadbast 87), tehsil Badshahpur.
The licence register prints the same licensed area, 17.99 acres.
- 62//128 kanal
- 62//137 kanal 16 marla
- 62//146 kanal 12 marla
- 62//198 kanal
Show the other 23 parcels
- 62//261 kanal 5 marla
- 62//9/2/12 kanal 18 marla
- 63//7/25 kanal 16 marla
- 61//158 kanal
- 45//2617 marla
- rectangle 62, kila 1/22 kanal 10 marla
- rectangle 62, kila 26 kanal 15 marla
- rectangle 62, kila 87 kanal 16 marla
- rectangle 62, kila 9/14 kanal 18 marla
- rectangle 45, kila 21/14 kanal 14 marla
- rectangle 62, kila 15/13 kanal 1 marla
- rectangle 63, kila 68 kanal
- rectangle 63, kila 98 kanal
- rectangle 63, kila 88 kanal
- rectangle 63, kila 10/24 kanal 11 marla
- rectangle 62, kila 1/15 kanal 10 marla
- rectangle 62, kila 118 kanal
- rectangle 63, kila 11/13 kanal 18 marla
- rectangle 63, kila 14/14 kanal
- rectangle 61, kila 5/118 marla
- rectangle 61, kila 5/27 kanal 2 marla
- rectangle 62, kila 3/22 marla
- rectangle 46, kila 25/27 kanal
The schedule also names who owned each parcel when the licence was granted. Bhumiq does not show those names.
From DTCP’s land schedule for this licence, read 18 Oct 2026. verify at source
Who owns this land today, or is it mortgaged?
The Bhumiq team checks it with you.
Check it yourself on jamabandi.nic.in
- Open jamabandi.nic.in, Haryana’s land records site, and choose Nakal.
- Pick district Gurugram, then the tehsil and the village: Badshapur (hadbast 87), tehsil Badshahpur. The site lists villages in Hindi, so the hadbast number is the surer match.
- Pick the latest year, then a from the list here, such as 62//12.
- Type the CAPTCHA the site shows. The copy it opens names the owners as the revenue department last recorded them.
Bhumiq does not open it for you. The site asks a person to type its CAPTCHA, and the record belongs to the revenue department.
- Collector rate, residential flat
- ₹6,950 per sq ft
Sector 69, collector rates effective 1 Apr 2026, Badshahpur tehsil. Source
Stamp duty is charged on the higher of the price and the collector rate value. The rate is the government's floor for duty, not a valuation: Bhumiq does not say what a flat is worth.
Worked out on this page. Not saved or sent.
Layouts & payment plan
Uploaded by the promoter to HARERA. These are the copies the regulator holds; an approval belongs to the department that issued it.
Site plan
1 fileLayout plan
1 fileBuilding plans
1 fileAmong the uploads Bhumiq read from HARERA's page on 15 Oct 2026 (10 in all), none is a floor plan or a payment plan.
source: https://haryanarera.gov.in/view_project/project_preview_open/374 · read 15 Oct 2026
The call is with the Bhumiq team. You need a free account so we can call you back.
Run due diligence on Tulip Infratech
Its court cases, its DTCP licences and the source of each fact, free once you sign in.
Open the developer profileAs of the fetch date shown, HARERA Gurugram records showed the facts above. Statuses change. Verify at the portal for transactions.